4. COOLING SYSTEM
4-6
Adding Coolant
Add coolant through filling port.
Start the engine and discharge air from cooling system
Check from filling port that air is fully discharged from
cooling system and install the radiator cap
Remove reservoir tank cap and add coolant till the upper
limit.
Note:
Check coolant level when the vehicle is on an even
ground.
Air Discharge
Discharge the air from cooling system according to the
following steps:
1. Remove drain bolt (
→
4-5), discharge air and install it
2. Start the engine and run it several minutes at idle
speed
3. Quickly increase throttle 3~4 times to discharge air
from cooling system;
4. Add coolant till filling port;
5. Repeat step 2 & 3 till no more coolant can be refilled;
6. Check coolant level in reservoir tank and refill till upper
limit.
7. Install reservoir tank cap.
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...