6. Engine Removal;Inspection & Installation
6-68
1 oil
inlet
6 The
tubing
A
2
Tubing bolt M12*30
torsion 35N.m
7
Tubing bolt M10*28
torsion 35N.m
3 copper
packing
Φ
12*18*1.5 8
Tubing bolt M12*43
torsion 35N.m
4 copper
packing
Φ
10*
Φ
18*1.5 9
Hexagon flange bolts M6*28
torsion 10N.m
5 The tubing B
10 oil seal
Φ
25*
Φ
47*13
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...