10. FRONT/REAR AXLE
10–8
6. TWO-FOUR-DRIVE CONVERSION MECHANISM FOR GROUP
Ref.No Description QTY
Ref.No
Description QTY
1 GEAR
MOTOR
1
9 WASHER(
φ
8×
ф
4×1)
3
2 RING
1
10 SPRING
PAD
4
3
3
DOWEL PIN(
φ
8×10)
2 11
HEX
NUT
3
4 BOLT,FLANGE(M6×25)
3
12 CONTACT
COVER
1
5 CONNTACT
COMPONENTS
1
13 WASHER(
φ
8×
ф
4×1)
2
6 GASKET
1
14 SPRING
PAD
2
7 SCREW
2
15 SCREW(M4×22)
2
8 CONTACT
WIRE
1
16 DIFFERENTIAL
CONTROLLER
1
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...