11. BATTERY
,
CHARGING SYSTEM
11-8
AC Magneto inspection
Remove engine cover
(
→
2-3
)
Remove AC Magneto (yellow, yellow, yellow), pickup coil
(black/white, green) connecter.
Resistance of Generator Coil
●
Measure resistance between the three lead wires;
●
Replace a new stator coil if resistance not within
specified value
●
Check that the generator core is insulated.
Set multimeter at 1×10
Ω
Generator Coil Resistance : 0.1-0.4
Ω
(Yellow-Yellow)
Insulate Resistance: 12-22K
Ω
(Yellow-Earthing wire)
Generator Non-load Performance
●
Start engine run it at 5000r/min
●
Measure AC voltage between three lead wires of
generator with multimeter.
●
Replace the generator if the voltage is lower than
the specified value.
Set Multimeter to AC Position
Generator Non-load Performance:
﹥
200V (AC) at 5000r/min
11
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...