3. CHECKS & ADJUSTMENT
3-4
Check Item
Intervals
Part
Item
Daily
1/2 year
Annual
Standard
Looseness of
joint parts
○
○
○
Drive Train
Final shaft
(Drive
shaft)
Sway of
Spline
○
Spark plug
○
○
Ignition
Device
Ignition
timing
○
○
Battery
Terminal Joint
○
Electrical
System
Wiring
Looseness
and damage
of joints
○
Fuel leakage
○
○
Fuel device
Throttle
○
Coolant level
○
○
○
Engine
Cooling
system
Coolant
leakage
○
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...