10. FRONT/REAR AXLE
10–11
z
Front axle assembly and adjustment
Illustration
:
Tightening torque
Item“ 1” 25Nm
Item“25” 10Nm
Item“30” 13Nm
Use fastening glue for item“30” assembly.
a. Use proper washer 8 and 10 thick ness to adjust
gear side clearance between drive pinion gear
and differential gear.
Drive bevel gear clearance measurement; Install sup-
port tools, tightening bolts(M10 ×1.25 ) put up
dial indicator, make sure 21 mm is between measuring
point and support tools. Turn support tools counter-
clock and read the data.
Standard: 0.10-0.25
Adjust washer
thickness
0.1 0.2 0.3 0.4
0.5 1.0
b. Shift fork and drive clutch assembly should be
against tightly to the arrow shape illustration.
10
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...