6. Engine Removal;Inspection & Installation
6-45
8.1 As shown in figure will be driven shaft block in special
the combination fixed, use the tool to loosen the M16 nut.
8.2 Active bevel gear check
●
Check the cone tooth gear tooth surface crack, point
or corrosion, so the defects, such as a crack, pitting
serious change is active bevel gear.
8.3 The driven shaft block bearing inspection
Use hand turn sluggish, bearing whether card bearing radial clearance is too large, if have, replace bearing.
6305Bearing radial clearance standards
0.013-0.028 mm
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...