5. REMOVAL OF ENGINE, TRANSMISSION SYSTEM AND GEARSHIFT
5-2
Disassembly Engine
Remove front and rear rack.(
→
Chapter 2).
Remove front and rear bumper.(
→
Chapter 2)
Remove plastic parts.(
→
Chapter 2)
Remove air filter.
Remove exhaust pipe and muffler
(
→
Chapter 2
)
Remove hoop .
Remove water inlet hose of engine
Remove bolt 1
Remove gear shift rod A.
Remove hoop.
Remove water outlet hose of engine
Remove connectors of magneto; connector of CDI,
pickup coil connector, magneto connector, connector
of gear sensor, connector of cathode as illustrated on
the right.
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...