5. REMOVAL OF ENGINE, TRANSMISSION SYSTEM AND GEARSHIFT
5-1
Inspection Information……………5-1 Removal and Installation of Front and Rear
Engine Removal and Installation…5-2 axle……………………………………5-5
Removal and Installation of Gearshift…5-7
Inspection Information
Note:
●
When removal Engine, please use jack to support the bodywork. Don’t damnify the
frame, body of Engine, bolt and cable etc.
●
Please blind up the frame when removal the engine.
●
Don’t removal engine from the bodywork when operating as follows:
—OIL PUMP
—CARBURETOR, AIR FILTER.
—COVER, CYLINDER HEAD,CYLINDER HEAD,CYLINDER,CAMSHAFT.
—CVT SYSTEM, CVT COVER.
—GEARBOX.
—RIGHT SIDE COVER, AC MAGNETO,WATE PUMP.
—PISTON
﹑
PISTON RING, PISTON PIN.
●
Following operation require removal of engine from vehicle:
—CRANKCASE
Tightening torque:
Engine front rear mounting bolt
(
M12
):
45
~
50N.m
Engine front rear mounting bolt
(
M8
):
23
~
25N·m
Engine rear upper bracket mounting bolt
(
M12
):
45
~
50N·m
Engine rear upper bracket mounting bolt
(
M8
):
23
~
25N·m
5
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...