6. Engine Removal;Inspection & Installation
6-53
14 oil
seal
Φ
25*
Φ
40*7 35 spring ring 6mm
15 O-ring
Φ
2.5*
Φ
47 36
Hexagon flange bolts M6*20
torsion 10N.m
16
Hexagon flange bolts M6*22
torsion
10N.m
37 crankshaft assembly
17
Rear bearing cover
38 copper packing
Φ
20*
Φ
28*0.5
18 oil
seal
Φ
40*
Φ
62*8 39
Balance shaft assembly
(see balance s
assembly instructions)
19 O-ring
Φ
2.5*
Φ
67 40 dowel
pin
Φ
12*18
20
Hexagon flange bolts M8*28
torsion 25N.m
41
Oil pump driven gear
21
Output shaft flange constructed
11.1 Oil pump assembly instructions
As shown in figure machine oil fixed, bolt
diagonal points to two to three times after
preloaded on tight. The oil pump shaft
rotation with time to be flexible.
11.2 As shown in figure will pack the crankshaft left
when song.
11.3 As shown in figure hand holding the
crankshaft neck to shake the crankshaft
crankshaft put in position.
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...