6. Engine Removal;Inspection & Installation
6-42
1
Hexagon flange bolts 14*26
7 Hexagon flange bolts M8*32
2
Shift positioning spring
8 driven shaft
3
Shift positioning steel balls
9 countershaft
4 O-ring
Φ
2*
Φ
10
10 Shift drum assembly
(see Z-05
explain)
5
drive shaft
11 water seal
6
reverse gear shaft
12 oil seal
Φ
12*25*7
(see Z-06 water sea
seal that split
)
7.1 As shown in figure the drive shaft remove,
directly from the right by hand on it out.
7.2
As shown in figure reverse gear shaft removal,
the reverse axial driven shaft direction tilt,
hands caught in reverse axis tilt out tooth surface.
7.3 As shown in figure driven shaft, deputy
shaft and shift drum remove, a hand grasp
on the driven shaft components active bevel
gear, and the other a hand grasp vice axis
and shift drum, gently in the copper with
right to strengthen place stroke, make three
components from the right out the cabinet.
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...