6. Engine Removal;Inspection & Installation
6-59
2.
Seal to divide evenly all coated in the right box processing surface
(
At about 0.3 mm
thickness
)
.
3.All of the flange bolts lock first diagonal tighten, which in turn lock.
4.
Close box lock bolts crankshaft, examined the output shaft, and shift drum of the drive
shaft rotation is flexible.
1
.
2
.
3
.
4
.
5
.
As shown in figure respectively with
6
.
his hands on the part about before and
7
.
after, pressure or so housing.
With the right to knock tongbang ends
about closed box
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...