For all except 4-in valves, use a 9/16-in socket and driver (or socket and ratchet, or
wrench), remove four [4] 3/8–16 X 1 1/2-in long screws (with lock and flat washers).
For 4-in valves, use 3/4-in socket and driver (or ratchet, or wrench) to remove four [4]
1/2–13 X 1 1/ 2-in long screws (with lock and flat washers).
Separate flange/adapter from valve.
Installation
If required, clock new valve to match failed valves motor/actuator orientation. Refer to Akron
Brass Installation Instructions for Style 8600 Electric Actuator With Motor Driver (P/N 123248)
for a Gen I valve or 127890, Style 8600 Electric Actuator Installation Instructions for a Gen II
valve and correct valves sector gear location/orientation.
Prior to installing a newly clocked valve, perform paragraph 4.5.3, Verifying Valve Operation After
Valve Clocking (below). Then continue the Installation portion of this procedure.
If an Akron Brass Swing-Out™ valve requires a repair kit to rebuild it, refer to the SAM PM
(FSG-MNL-00212), Repair Part Kits (paragraph 2.2.2.2).
A.
Install new valve on inlet flange/adapter as follows.
Do not lubricate the Ball or Seats. Lubricants can collect dirt and grit, which can cause
excessive wear. Water is a natural lubricant. Periodic actuation of the valve will help
prevent sticking. Periodic Flushing is recommended to remove dirt and debris which
may cause excessive Valve wear and premature failure.
Reversing the inlet and outlet of an 8840 (4-in) Akron Brass Swing-Out™ Valve reduces
the pressure rating of the valve.
Align inlet side of new valve to inlet flange/adapter.
Hand start four [4] screws (each with a lock washer and a flat washer).
(3/8–16 X 1 1/2-in long screws [for all valve sizes less than 3-in])
or (1/2–13 X 1 1/2-in long screws [for all valve sizes 3-in or larger])
Tighten/torque four screws in accordance with Adapter Torque Requirements paragraph
and figure. (Refer to 109896, Akron Swing-Out™ Valve Installation And Operating In-
structions for both Gen I and Gen II valves.)
B.
Install outlet flange/adapter as follows.
Align outlet flange/adapter to new valve.
Hand start four [4] screws (each with a lock washer and a flat washer).
(3/8–16 X 1 1/2-in long screws [for all valve sizes less than 3-in])
or (1/2–13 X 1 1/2-in long screws [for all valve sizes 3-in or larger])
Tighten/torque four screws in accordance with Adapter Torque Requirements paragraph
and figure. (Refer to 109896, Akron Swing-Out™ Valve Installation And Operating In-
structions for both Gen I and Gen II valves.)
NOTE
All replacement Akron Brass Swing-Out™ valves, in a SAM system, require the submis-
sion of FSG-PL-01508 when ordered. (Provides the parameters of the valve being re-
placed so Hale Products can program the replacement valve.) If the replacement valve
programming fails (or the information provided was incorrect) perform the following.
Summary of Contents for Hale Sam
Page 2: ......
Page 37: ...17 Figure 14 SAM Blue CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 38: ...18 Figure 15 SAM Green CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 39: ...19 Figure 16 SAM Red CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 40: ...20 Figure 17 SAM System Drain And Pneumatic Diagram...
Page 41: ...21 Figure 18 SAM Speaks Diagram...
Page 42: ......
Page 58: ...38 THIS PAGE INTENTIONALLY BLANK...
Page 62: ...42 THIS PAGE INTENTIONALLY BLANK...
Page 192: ...172 THIS PAGE INTENTIONALLY BLANK...
Page 206: ...186 THIS PAGE INTENTIONALLY BLANK...
Page 220: ...200 THIS PAGE INTENTIONALLY BLANK...