background image

FusionModule1000A40 IT Solution 
Maintenance Guide (2016.05, AI Version) 

5 Components Replacement 

 

Issue 04 (2018-01-05) 

Huawei Proprietary and Confidential                                     

Copyright © Huawei Technologies Co., Ltd. 

141 

 

 

 

For the diagrams, see the initial configuration parameter manual for the solution in use.   

 

Before replacing the StroBell, inform the related administrative departments of the 
temporary downtime of the fire extinguishing system. After the replacement, inform the 
administration department that the system has become normal.   

Procedure 

Step 1

 

Disconnect the battery cables, and switch off the input circuit breaker of the extinguishant 
control panel.   

Step 2

 

Remove the screws securing the StroBell using a hex key, and remove the StroBell cover.   

Figure 5-72

 

Removing the StroBell cover 

 

 

Step 3

 

Remove the StroBell cables and label them.   

 

As a terminal resistor is connected to the last StroBell in the loop in parallel, remove the terminal 
resistor from the faulty StroBell, and connect the resistor to the new StroBell when you replace the 
StroBell.   

Summary of Contents for FusionModule 1000A40

Page 1: ...FusionModule1000A40 IT Solution V200R002C00 Maintenance Guide 2016 05 AI Version Issue 04 Date 2018 01 05 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ... Huawei and the customer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this docum...

Page 3: ...operation and maintenance O M methods of the FusionModule1000 Intended Audience This document is intended for Maintenance engineers Technical support engineers System engineers Hardware installation engineers Commissioning engineers Data configuration engineers Symbol Conventions The symbols that may be found in this document are defined as follows Symbol Description Indicates an imminently hazard...

Page 4: ... personal injury equipment damage and environment deterioration Change History Changes between document issues are cumulative The latest document issue contains all updates made in previous issues Issue 04 2018 01 05 Added the Tyco fire extinguishing system Divided the server cabinet layout into two scenarios Issue 03 2017 08 20 Changed the end door structure at the outdoor unit side of the pre fa...

Page 5: ...3 Monitoring System 12 3 2 4 Fire Extinguishing System Standard 13 3 2 5 Fire Extinguishing System CE Kidde 15 3 2 6 Fire Extinguishing System CE Tyco 16 3 2 7 Other Systems 17 3 3 Quarterly Maintenance 18 3 3 1 Power Supply and Distribution System 18 3 3 2 Cooling System 20 3 3 3 Monitoring System 24 3 3 4 Fire Extinguishing System Standard 25 3 3 5 Fire Extinguishing System CE Kidde 26 3 3 6 Fir...

Page 6: ...onditioner Alarms 60 5 Components Replacement 67 5 1 Replacing Power Supply and Distribution System Components 67 5 1 1 Replacing a PD510 electricity meter 67 5 1 2 Replacing the SPD in a PDC 68 5 1 3 Replacing a Monitoring rPDU 70 5 1 4 Replacing an rPDU 71 5 1 5 Replacing a Light Standard 73 5 1 6 Replacing a Light CE 76 5 2 Replacing Cooling System Components 77 5 2 1 Replacing a Remote T H Sen...

Page 7: ...obe Standard 112 5 4 5 Replacing a Fire Alarm Sounder Standard 114 5 4 6 Replacing the Emergency Start Abort Switch Standard 116 5 4 7 Replacing Batteries for the Fire Alarm Control Panel Standard 118 5 4 8 Replacing a Fire Cylinder Standard 120 5 4 9 Charging Extinguishant 127 5 4 10 Replacing a Fire Alarm Control Panel Standard 130 5 4 11 Replacing an Emergency Light Standard 132 5 5 Replacing F...

Page 8: ...tions 177 6 1 Emergency Operations for Mains Failure 177 6 2 Emergency Operations for Circuit Breaker Tripping 178 6 3 Emergency Operations for Overload 178 6 4 Emergency Operations for Overtemperature 179 6 5 Emergency Operations for the Management System Communication Failure 179 6 6 Emergency Operations When Pre fab Module Door Cannot Open 180 6 7 Emergency Operations for Pre fab Module Door Op...

Page 9: ...ark the cables with their corresponding port numbers for later connection Before connecting a power cable check that the label on the power cable is correct For the detailed power control relationships between devices see the power distribution system diagram During battery O M observe the following Insulate tools before battery O M Assign only professional engineers to perform the O M Do not use ...

Page 10: ... for the solution in use Management System Assign only professional engineers to perform O M for the management system Routine maintenance for the management system is critical for long term stable and efficient operation of the FusionModule1000 because most alarms are reported over the management system Promptly handle reported alarms to prevent equipment damage or service interruption For detail...

Page 11: ...05 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 3 2 Preparations 2 1 Tools Table 2 1 Tools Tools Phillips screwdriver M4 M6 M8 Flat head screwdriver 2 5 mm Adjustable wrench Electrician s knife Needle nose pliers Diagonal pliers Crimping tool Wire stripper RJ45 crimping tool ...

Page 12: ...nologies Co Ltd 4 Tools Cable cutter Hex key Hand held thermohygrograph Multimeter Electroprobe Network cable tester Heat gun Utility knife Step ladder 2 m Cable tie Insulation tape ESD wrist strap ESD gloves Protective gloves Clamp meter Socket wrench ESD floor suction plate N A The listed tools are for routine maintenance only Prepare other tools as required ...

Page 13: ...0 Installation Guide 2016 05 AI Version Describes details about how to install the FusionModule1000 Download this document from http e huawei com FusionModule1000A 40 IT Solution V200R002C00 Commissioning Guide 2016 05 AI Version Describes details about how to commission the FusionModule1000 Download this document from http e huawei com ECC500 V600R001C03 User Manual Describes how to operate and m...

Page 14: ...e huawei com NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual Describes how to operate and maintain the air conditioner Download this document from http e huawei com Gas extinguishing controller documents Describes how to install commission and maintain the gas extinguishing controller Delivered with the fire control panel FusionModule1000A V200R002C00 C10 Outsourced Comp...

Page 15: ... by following instructions in this document contact Huawei technical support for remote troubleshooting assistance When contacting Huawei technical support you need to provide the following information Full name of the site where the fault alarm occurs Name and phone number of the contact person Fault scenario and detailed fault information Table 2 4 Obtaining technical support from Huawei If Then...

Page 16: ...isplayed in the alarm information area perform the following operations 1 Clear the alarm by following instructions in iManager NetEco Product Document NetEco Version 2 Check whether cables are connected properly and rectify faults Camera images and coverage Choose Configuration Camera Management Video Camera Management right click a camera name on the right side and view the video images captured...

Page 17: ...ance checklist for the power supply and distribution system Item Method Expected Result Troubleshooting Luminance of the three phase indicators Check the luminance of the three phase indicators The three phase power indicators are steady on Replace an indicator if it generates no or dim light SPD indicator and SPD circuit breaker status Check the SPD indicator and SPD circuit breaker status The SP...

Page 18: ...ethod Expected Result Troubleshooting Electric heaters of the 20 kW air cooled precision air conditioner s Check electric heaters The electric heaters are secure If an electric heater is loose secure it The electric heater surface is not corroded If the surface of an electric heater is corroded replace the electric heater by following instructions in NetCol5000 A 20 kW Air Cooled In Row Precision ...

Page 19: ... oil stains If a compressor service valve is covered by oil stains clean the oil stains Compressor running sound of the 20 kW air cooled precision air conditioner Listen to the compressor running sound No abnormal noise is generated If the compressor generates abnormal noise replace the compressor by following instructions in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manu...

Page 20: ...itoring System Table 3 4 Monthly maintenance checklist for the monitoring system Item Method Expected Result Troubleshooting Event and operation logs in the RH2288 server Choose System Event Log in the navigation tree Normal system events are displayed If a system event exception is found troubleshoot by referring to documents delivered with the RH2288 server ECC500 collector Check the indicators ...

Page 21: ... check whether the electronic lock or card reader is normal Replace the end door card reader if it is faulty Press the exit button inside the pre fab module to open the module door The module door can be opened after you press the exit button Replace the exit button if the module door cannot be opened If the pre fab module door cannot be opened from inside the module using the exit button you can ...

Page 22: ...g is intact Repaint The lead seal and safety signs on hand operated devices are intact Replace the electromagnetic valve Read the pressure shown on the pressure gauge The pressure pointer is in the green zone Ask a local maintenance engineer to check whether the fire cylinder leaks extinguishant If leakage occurs the maintenance engineer asks the fire extinguisher manufacturer to recharge the exti...

Page 23: ...list for the fire extinguishing system Device Operation Check Standard Troubleshooting Extinguisha nt control panel Check indicators on the extinguishant control panel The power indicator turns on and the alarm indicator turns off Replace the extinguishant control panel Extinguisha nt control panel batteries Check the battery terminals The wiring terminals are in good condition without corrosion C...

Page 24: ...cy light The emergency light turns on Replace the emergency light 3 2 6 Fire Extinguishing System CE Tyco Table 3 7 Monthly maintenance checklist for the fire extinguishing system Device Operation Check Standard Maintenance Guide Extinguisha nt control panel Check indicators on the extinguishant control panel The power indicator turns on and the alarm indicator turns off Replace the extinguishant ...

Page 25: ...light Disconnect the power plug of the emergency light The emergency light turns on Replace the emergency light Smoke detector Check the smoke detector indicator The indicator blinks once every 6s Replace the smoke detector Heat detector Check the heat detector indicator The indicator blinks once every 6s Replace the heat detector 3 2 7 Other Systems Table 3 8 Monthly maintenance checklist for oth...

Page 26: ...ty or solar radiation outside the pre fab module does not meet the project solution requirements contact Huawei technical support 3 3 Quarterly Maintenance 3 3 1 Power Supply and Distribution System Table 3 9 Quarterly maintenance checklist for the power supply and distribution system Item Method Expected Result Troubleshooting UPS2000 G LCD Press on the control panel After you press any button on...

Page 27: ...restored the UPS automatical ly switches to battery mode or online mode 2 The voltage between the two terminals of the battery packs is around 535 V If any single battery is faulty replace the entire battery string UPS2000 G fastening bolts Check the UPS2000 G fastening bolts The fastening bolts are secured If any fastening bolt is loose tighten all fastening bolts using a torque wrench UPS2000 G ...

Page 28: ...Quarterly maintenance checklist for the cooling system Maintenance Item Operation Check Standard Troubleshooting Indoor fan of the 20 kW air cooled precision air conditioner Check the indoor fan The fan cover is not misshapen If the fan cover is misshapen maintain or replace the cover The fan blades are intact If a fan blade is damaged replace the indoor fan by following instructions in NetCol5000...

Page 29: ...ten the screw Air filters of the 20 kW air cooled precision air conditioners Check the air filters The filters are clean and not blocked If an air filter is dirty or blocked remove dust from the air filter using a brush or vacuum cleaner The air filters are not damaged or misshapen Replace any damaged or misshapen air filters for a 20 kW air cooled precision air conditioner Condensate pan and floa...

Page 30: ...in the humidifier cylinder drops continuously the drainage is normal If the drainage is abnormal If the drainage solenoid valve cannot be opened check whether the solenoid valve control circuit is normal If the control circuit is normal replace the solenoid valve by following instructions in documents delivered with the air conditioner If the drainpipe is blocked clean the drainpipe If the humidif...

Page 31: ...umidifier cylinder is dirty and the water level inside the cylinder is above 4 5 replace the humidifier cylinder by following instructions in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual Thermal insulation foam of the water refill pipe drainpipe and vapor hose of the humidifier Check the thermal insulation foam of the water refill pipe drainpipe and vapor hose The the...

Page 32: ...nd check the alarm information displayed on the monitoring software terminal The management system generates a door status alarm Replace the door status sensor If no alarm is generated Access controller Check the power indicator of the access controller The power indicator is steady red If the power indicator is off the power supply to the controller is abnormal Immediately switch off the power in...

Page 33: ...oltage are normal If the mains input power is normal check whether the fuse is intact If the fuse is blown replace the fuse 2 Replace batteries for the fire alarm control panel Hand held fire extinguishe r Check the fire extinguisher The fire extinguisher is intact Replace the fire extinguisher The pressure pointer of the fire extinguisher is in the green zone Replace the fire extinguisher The fir...

Page 34: ...oltage using a multimeter 1 The extinguisha nt control panel reports a power supply fault 2 The battery voltage is 24 1 V DC Replace batteries for the extinguishant control panel Hand held fire extinguishe r Check the hand held fire extinguisher The hand held fire extinguisher is in good condition Replace the hand held fire extinguisher The pressure pointer of the hand held fire extinguisher is in...

Page 35: ...nd held fire extinguisher is in good condition Replace the hand held fire extinguisher The pressure pointer of the hand held fire extinguisher is in the green zone The hand held fire extinguisher is within the validity period 3 3 7 Other Systems Table 3 15 Quarterly maintenance checklist for other systems Item Method Expected Result Troubleshooting Pre fab module body Check the pre fab module The ...

Page 36: ...S by following instructions in documents delivered with the ATS The display panel of the controller displays information properly If the display is abnormal vague or no display 1 Check and reconnect the power cable 2 Replace the ATS by following instructions in documents delivered with the ATS 3 4 2 Cooling System Table 3 17 Semi annual maintenance checklist for the cooling system Item Method Expe...

Page 37: ...emperature protection circuit breaker Input and output cables are securely connected to the main control board If an input or output cable of the main control board is not properly connected reconnect the cable terminal Dust inside the electric control box Check the electrical components control components SPDs and voltage detection boards Electrical components control components SPDs and voltage ...

Page 38: ...rate check and calibrate the T H sensor using a temperature and humidity measuring instrument with higher precision Remove the electric control box before maintaining components inside it 3 4 3 Monitoring System Table 3 18 Semi annual maintenance checklist for the monitoring system Item Method Expected Result Troubleshooting LAN switch power indicator PWR Check the indicator The PWR indicator is s...

Page 39: ... detector point type Dip the water sensor into water and view alarms in the management system The management system generates an alarm Replace the water sensor point type if no alarm is generated Electronic lock indicator Check the indicator on the electronic lock The indicator turns red when the pre fab module door is opened The indicator turns green when the pre fab module door is closed Replace...

Page 40: ...or card reader if the door still cannot be opened Mechanical lock Check the mechanical lock The mechanical lock is free from rust or corrosion If the mechanical lock is rusty or corroded and affects door opening contact Huawei technical support 3 4 4 Fire Extinguishing System Standard Semi annual maintenance of the fire extinguishing system involves system commissioning Before the maintenance info...

Page 41: ...nguishing system devices standard if the expected result does not occur Fire alarm sounder Unlock the fire alarm control panel and press ALARM BELL The alarm is loud and clear 1 Check and reconnect cables to the fire alarm sounder 2 Replace the fire alarm sounder if the fault persists Gas release indicator Disconnect the red and black cables from the pressure announciator and short circuit the cab...

Page 42: ...smoke density is below the alarm threshold the alarm indicator blinks once every 6s Replace the smoke detector If the smoke density exceeds the alarm threshold the indicator turns on The fire alarm control panel generates an alarm and triggers the fire alarm sounder Replace the smoke detector if the fault persists Fire alarm horn strobe Unlock the fire alarm control panel and press HORN STROBE The...

Page 43: ...cylinder and inform the administrative departments that the fire extinguishing system has become operational Table 3 20 Semi annual maintenance checklist for the fire extinguishing system Device Operation Check Standard Troubleshooting Fire extinguishi ng system commission ing Commission the fire extinguishing system by following the instructions in the Fire Extinguishing System Commissioning CE s...

Page 44: ... loop 2 FIRE RELAY and the buzzer buzzes Replace the smoke detector Extinguisha nt discharge abort 1 After the manual gas release button is pressed on the extinguishant control panel the gas release countdown starts Then press the extinguishant discharge abort 2 Reset the extinguishant discharge abort by rotating it counterclockwi se 1 After the extinguishant discharge abort is pressed the gas rel...

Page 45: ...ystem involves system commissioning Before the maintenance inform the related administrative departments that the fire extinguishing system will be maintained and stop working Before maintaining the fire extinguishing system remove the electrical actuator from the container valve of the fire cylinder This prevents the extinguishant release due to misoperations and prevents accidental damage After ...

Page 46: ...lt persists Warning sign Pull up the reset button on the pneumatic switch The warning sign indicator is on Replace the warning signs Heat detector Heat the heat detector using a heating device 1 If the temperature is below the alarm threshold the alarm indicator blinks once every 6s 2 If the temperature is above the alarm threshold the indicator turns on The extinguishant control panel generates a...

Page 47: ... abort button Horn strobe Press the manual gas release button on the extinguishant control panel The horn strobe generates glaring flashes and shrill alarms Replace the internal horn strobe or replace the external horn strobe 3 4 7 Other Systems Table 3 22 Semi annual maintenance checklist for other systems Item Method Expected Result Troubleshooting Lights Turn on the light circuit breakers The l...

Page 48: ...e trays or replace damaged and seriously corroded parts For details see the installation guide for the corresponding solution Cables Check cable connections Cables are securely connected without bare terminals Tighten any loose cable terminals and replace any incompliant terminals by following instructions in the installation guide Check the cable appearance Cable jackets are free from damage or c...

Page 49: ...othly or jams repair or replace the circuit breaker For details contact Huawei technical support Fastening bolts between power cables and the busbar After the equipment is powered off perform the following steps Check whether the cables have aged Check the insulation layers of cables Measure the insulation resistance of cables Check the cable labels Check the fastening bolts The insulation layers ...

Page 50: ...ins There is no lodging fin If there are lodging fins comb the lodging fins using a fin brush Leakage Check welding points and needle valves using soap water There is no leakage point If leakage occurs reclaim the refrigerant and contact Huawei technical support Monito ring system Air filter of the ventilator Shut down the fan and check whether the air filter is blocked The air filter is not block...

Page 51: ... Result Troubleshooting Optional External cable tray grounding Check the ground cable connections between cable trays Check that the cable trays and their supports are properly connected to the ground grid Ground points on cable trays are intact and free from rust The ground bolts are securely grounded and free from rust If the cable tray ground points are damaged repair them and take anti corrosi...

Page 52: ...intenance Guide 2016 05 AI Version 4 Alarms and Faults Issue 04 2018 01 05 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 44 4 Alarms and Faults 4 1 Alarm Handling Flowchart Figure 4 1 Alarm handling flowchart ...

Page 53: ...etary and Confidential Copyright Huawei Technologies Co Ltd 45 4 2 Viewing and Collecting Alarm Information Prerequisites An alarm is generated Alarm information helps to rapidly locate and rectify faults Obtaining Tools and Materials Documents delivered with the NetEco management system Documents delivered with components ...

Page 54: ...information Step 3 Collect alarm information After an alarm is generated immediately collect the following information Occurrence time and place Detailed fault symptoms Operations performed before the fault occurs Services and scope affected by the fault alarm Measures taken after the fault occurs and the effect End Example Table 4 1 Alarm information collection table Alarm Time Alarm Location Sym...

Page 55: ...munication interruption 4 4 Locating and Rectifying Faults Locating Faults Locate faults from the following aspects Component Locate the component for which the alarm is generated such as a UPS or an air conditioner Module Locate the faulty module after locating a faulty component such as the UPS controller or the air conditioner controller Alarm Handling After locating the component or module for...

Page 56: ... handling process Common alarm references are as follows Data center infrastructure alarm reference in the online help of the management system Alarm references in documents delivered with components Alarm reference in this document Alarm reference obtained from Huawei technical support It is recommended that the alarm handling report consists of information about the alarm occurrence time locatio...

Page 57: ...e actual situation into consideration Only trained and qualified personnel are allowed to perform emergency operations For more emergency operations for the FusionModule1000 contact Huawei technical support FusionModule1000 Common Critical Alarms and Faults Table 4 2 Common critical alarms and faults Common Critical Alarm and Emergency Operation Find Through Possible Cause Possible Impact Mains Su...

Page 58: ...ty The circuit is faulty O M personnel cannot go into or out of the pre fab module Pre fab Module Door Open Alarm System and equipment alarms or maintenance The pre fab module door is open Safety of the equipment may be affected Single Fire Standard System and equipment alarms or maintenance A smoke alarm or temperature alarm is generated A fire occurs Double Fire Standard System and equipment ala...

Page 59: ...ffect the stable running of the system and equipment safety Therefore any fire alarm must be immediately handled 4 7 Fire Alarms CE Fault Category Alarm Severity Operation FIRE RELAY Critical For details about how to handle a FIRE RELAY alarm see emergency operations for a FIRE RELAY alarm CE LOCAL FIRE Critical For details about how to handle a LOCAL FIRE alarm see emergency operations for a LOCA...

Page 60: ...r the air conditioner power cables are connected properly The air conditioners are not turned on Turn on the air conditioners The air conditioner is not properly set Verify that the temperature and humidity settings are consistent with the settings specified in the cooling system initial parameter configuration manual An air conditioner component is faulty Replace faulty parts by following instruc...

Page 61: ...l The T H sensor is faulty Replace the remote T H sensor for an air conditioner 4 9 Humidity Alarms Fault Category Alar m Sever ity Symptom Possible Cause Troubleshooting Humidity too high Gener al The onsite humidity is normal The T H sensor is faulty Replace the remote T H sensor for an air conditioner The humidity threshold is not properly set Verify that the temperature and humidity settings a...

Page 62: ...he onsite humidity is too low The humidification function of air conditioners is abnormal For details see NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual 4 10 Door Status Alarm Fault Category Alar m Sever ity Symptom Possible Cause Troubleshooting Door open alarm Critica l No pre fab module door is open The sensor is incorrectly set Reset the door status sensor The senso...

Page 63: ...sion The card reader is faulty Verify the card reader cable connections or replace the end door card reader 4 12 Water Intrusion Alarm Fault Category Alar m Sever ity Symptom Possible Cause Troubleshooting Water Intrusion Alarm Gener al There is no water onsite The water sensor is faulty Replace the water sensor point type There is water onsite A pipe is damaged Contact Huawei technical support A ...

Page 64: ... high Dehumidify the FusionModule1000 using a dehumidifier Condensate water cannot be drained The condensate drainpipe is blocked or frozen Remove foreign matters using a thin iron wire or remove the ice 4 13 Mains Outage Alarm Fault Category Alar m Sever ity Symptom Possible Cause Troubleshooting Mains outage Major The FusionModule1000 is power off The mains supply is cut off Switch to another ma...

Page 65: ...al time monitoring cannot be performed The FusionModule1 000 is powered off or the circuit breaker has tripped Refer to the section Emergency Operations for the Management System Communication Failure or Emergency Operations for Circuit Breaker Tripping VCN500 communic ation failure Major Real time monitoring cannot be performed Cables are not properly connected Verify the cable connections The de...

Page 66: ...m Fault Category Alar m Sever ity Symptom Possible Cause Troubleshooting ATS alarm Warni ng The switchover fails The control terminals are not properly connected Properly connect the terminals The voltages of both power supplies are outside of the normal working range Check the power supplies and verify that the voltage of at least one power supply meets the requirements The motor fuse is blown Th...

Page 67: ...the UPS input voltage meets specifications Major The mains is normal but the AC input indicator is off The UPS runs in battery mode The UPS mains switch is OFF Turn on the UPS mains switch The input power cable is not securely connected Check the UPS input power cable connection Major The UPS does not report faults but has no output voltage The output power cable is not securely connected Check th...

Page 68: ...PS will soon shut down due to low battery and loads will be powered off Save data and shut down primary loads immediately to avoid data loss or corruption Connect the UPS input to the backup AC power supply immediately The number of batteries or the battery capacity is incorrectly set Verify that the number of batteries and battery capacity are correctly set based on the actual configuration and t...

Page 69: ...device generates a fault alarm Check whether an alarm is generated If yes handle the alarm by referring to the alarm reference list The compressor does not need to start Check whether cooling is required on the controller home page The power supply for the compressor is faulty Check that the compressor input power is normal Remove the X115 compressor terminals measure the terminal voltages at the ...

Page 70: ...er the power cable is abnormal and whether the compressor power supply circuit breaker is off or abnormal If a fault is identified rectify the fault and check whether the abnormality disappears The compressor is damaged Replace the compressor by following instructions in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual Major The compressor generates a loud noise The sheet...

Page 71: ...s at short intervals Troubleshoot by following instructions in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual and check whether the abnormality disappears The compressor suffers from slugging Contact Huawei technical support Major An indoor fan does not work A fan fault alarm is generated Check whether a fan fault alarm is generated If yes troubleshoot by following inst...

Page 72: ... Possible Cause Troubleshooti ng The fan does not need to work Choose Run Status on the controller home screen and check the indoor fan control status If the control status is 0 the fan does not need to work and there is no fault If the control status is greater than 0 the fan is faulty and needs to be rectified The switch of the indoor fan is not turned on Turn on the switch and check whether the...

Page 73: ...erminals of the fan and check whether the voltage between the 0 V and 48 V terminals is 48 V using a multimeter If the voltage differs too much the power supply is abnormal If the power supply is normal the indoor fan is faulty Replace the indoor fan by following instructions in the Replacing an Indoor Fan section in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual and ch...

Page 74: ...oat is damaged or jammed adjust the float or perform replacement by following instructions in the Replacing a Float section in NetCol5000 A 20 kW Air Cooled In Row Precision Air Conditioner User Manual The water inlet pipe leaks Check whether the water inlet pipe leaks If yes repair the leakage point The drainpipe is blocked or the drainage solenoid valve is faulty Check whether the drainpipe is b...

Page 75: ...510 electricity meter of the same model is available and functional When replacing a PD510 electricity meter switch off the upper level circuit breaker of the PD510 electricity meter to be replaced Impact on the System Certain services in the FusionModule1000 are interrupted Preparations Tools Phillips screwdriver protective gloves Materials spare PD510 electricity meter Documents documents delive...

Page 76: ...s connected properly Step 7 Optional Install the panel of the PD510 electricity meter Step 8 Switch on the upstream circuit breaker of the PD510 electricity meter Step 9 Configure the PD510 electricity meter by referring to the initial configuration table for the PD510 electricity meter Step 10 Check that the new PD510 electricity meter is working properly After power on press buttons on the PD510...

Page 77: ...ker Step 3 Detect the L1 L2 L3 and N voltages to the PE using an electrical tester pen and verify that the faulty SPD has no voltage before replacing the faulty SPD module Figure 5 1 Detecting the voltages Step 4 Hold down the faulty SPD module and pull it out Figure 5 2 Replacing an SPD module If there is a faulty SPD module it is recommended that all SPD modules be replaced If the SPD module can...

Page 78: ...ring rack power distribution unit rPDU needs to be replaced A spare monitoring rPDU of the same model is available and functional Impact on the System None Preparations Tools Phillips screwdriver protective gloves Materials spare monitoring rPDU Document none Skill requirement electrician s work permit Procedure Step 1 Shut down devices powered by the monitoring rPDU Step 2 Switch off the circuit ...

Page 79: ... the devices powered by the monitoring rPDU End Follow up Procedure Dispose of the removed monitoring rPDU that is confirmed faulty 5 1 4 Replacing an rPDU Prerequisites An rPDU needs to be replaced A spare rPDU of the same model is available and functional Locate the faulty rPDU based on the alarm information on the monitoring software terminal Check that the standby power supply to the rPDU is a...

Page 80: ...cabinet using a Phillips screwdriver Step 4 Remove the rPDU power cable on the top of the cabinet Step 5 Use a Phillips screwdriver to remove the screws that secure the rPDU support from the upper and lower parts of the rPDU front panel Figure 5 4 Removing screws at the upper and lower parts of the rPDU Step 6 Lift the faulty rPDU and take it out Step 7 Remove the support and screws from the fault...

Page 81: ... on the circuit breaker for the rPDU in the PDC and check that the new rPDU is working properly Step 11 Insert device power plugs in the rPDU Step 12 Reinstall the cabinet top baffle plate End Follow up Procedure Dispose of the removed rPDU that is confirmed faulty 5 1 5 Replacing a Light Standard Prerequisites Before replacement disconnect the light power switch to avoid live line working Context...

Page 82: ...epare a portable light Preparations Tools insulation gloves step ladder 2 m portable light Material spare light tube Document lighting device layout diagram Skill requirement none For the diagram see the initial configuration parameter manual for the solution in use Procedure Step 1 Disconnect the power switch of the light Step 2 Optional Push up the PC plate with both hands When the PC plate is h...

Page 83: ...shade is deformed and pull it downwards to remove it Figure 5 7 Removing the end cover of a PC light shade Step 4 Rotate the light tube to make the tube pins aligned with the grooves of the light holder and then remove the damaged light tube Step 5 Insert the pins at both ends of a new light tube into the light holder and rotate the light tube to tighten it Step 6 Optional Reinstall the PC light s...

Page 84: ...erial spare light Documents none Skill requirement electrician s work permit Procedure Step 1 Locate a failed light If a light does not work but the cables to the light are intact the light has failed and needs to be replaced If all lights after a light do not work the light adjacent to the working light has failed Step 2 Disconnect the power supply to the lights Step 3 Remove the faulty light Dur...

Page 85: ...oling devices Skill requirement cooling engineer For the tables see the initial configuration parameter manual for the solution in use Procedure Step 1 Remove the network cable from the remote T H sensor Figure 5 8 Removing the network cable from the remote T H sensor Step 2 Remove the faulty remote T H sensor install a new remote T H sensor and reconnect the network cable to the sensor Step 3 Set...

Page 86: ...ioner User Manual During air conditioner parts replacement the air conditioner may need to be powered off Take measures to prevent device overheating Table 5 1 Parts that can be replaced for a 20 kW precision air conditioner No Item 1 Air filter 2 Indoor fan 3 Compressor 4 Humidifier cylinder 5 Electric heater 6 Solenoid valve coil 7 Components inside the control box including the main control boa...

Page 87: ...Step 2 Unlock the air conditioner cabinet door at the top pull the upper part of the door outwards by 200 mm remove the ground cable at the bottom of the door and remove the rear door Step 3 Rotate the fixing cards on the two sides of the air filter as shown by 1 in Figure 5 9 Step 4 Pull out the air filter as shown by 2 in Figure 5 9 Figure 5 9 Removing the air filter Step 5 Correctly install the...

Page 88: ...confirmed faulty 5 2 4 Replacing a Ventilation Vent Air Filter Prerequisites An air filter needs to be replaced A spare air filter of the same model is available and functional Impact on the System None Preparations Tool flat head screwdriver step ladder brush Materials spare air filters Document none Skill requirement cooling engineer Procedure Step 1 Remove the air filter using a flat head screw...

Page 89: ...oam brush protective gloves ESD floor suction plate Materials thermal insulation foam dry rag Document none Skill requirement cooling engineer Procedure Step 1 Optional Open the aisle floor using the ESD floor suction plate Step 2 Remove the straps and thermal insulation foam from a pipe Step 3 Wipe off the condensate water from the surface of the pipe If the condition allows close the valves at b...

Page 90: ...placing Pipes 5 2 6 1 Replacing the Humidifier Water Refill Pipe for a Precision Air Conditioner Prerequisites A humidifier water refill pipe needs to be replaced A spare humidifier water refill pipe of the same model is available and functional Water refill devices are available Impact on the System None Preparations Tools hex key long sleeved silicone gloves vessel adjustable wrench ESD floor su...

Page 91: ...l water in the pipe to the vessel Step 5 Install a new water refill pipe Check that the safety clamp is secured and that the water pipe does not leak Step 6 Open the control valve of the water refill pipe wait until the new pipe is working properly and wrap the new pipe with a thermal insulation layer Step 7 Optional Reinstall the aisle floor End Follow up Procedure Dispose of the removed humidifi...

Page 92: ...r and block the condensate drainage port using a rubber plug Hold the removed drainpipe properly to prevent residual water from flowing out into the pre fab module Step 5 Remove the other end of the condensate drainpipe Step 6 Take out the rubber plug and install a new condensate drainpipe Step 7 Check that the new condensate drainpipe is working properly If there is no water in the condensate wat...

Page 93: ... connector remove the band clamp on the Pagoda connector using a Phillips screwdriver and remove the drainpipe from the Pagoda connector Step 4 Move the faulty dehumidifier away from the installation position Exercise caution when moving the dehumidifier because it is heavy Step 5 Use a Phillips screw driver and band clamp to secure the drainpipe of the new dehumidifier to the Pagoda connector and...

Page 94: ...nsor Document monitoring device layout diagram Skill requirement weak current engineer For the diagrams see the initial configuration parameter manual for the solution in use Procedure Step 1 Locate the water sensor to be replaced based on the alarm information on the monitoring software terminal Figure 5 12 Point type water sensor Step 2 Remove the captive screws from the faulty water sensor usin...

Page 95: ...A door status sensor needs to be replaced A spare door status sensor of the same model is available and functional Impact on the System None Preparations Tools step ladder 2 m Phillips screwdriver small sized flat head screwdriver protective gloves Materials spare door status sensor Documents monitoring device layout diagram initial configuration parameters for the management system Skill requirem...

Page 96: ...oor was opened If yes the door status sensor is working properly End Follow up Procedure Dispose of the removed door status sensor that is confirmed faulty 5 3 3 Replacing a Camera Prerequisites A camera needs to be replaced A spare camera of the same model is available and functional Impact on the System None Preparations Tools Phillips screwdriver flat head screwdriver step ladder protective glo...

Page 97: ...rietary and Confidential Copyright Huawei Technologies Co Ltd 89 Procedure Step 1 Remove screws securing the camera cover using a Phillips screwdriver Figure 5 15 Removing screws securing the transparent cover Step 2 Use a Phillips screwdriver to remove the screws that fasten the camera to its base Figure 5 16 Removing screws ...

Page 98: ...dicator of the camera is on the camera is working properly Step 8 Reinstall the camera cover End Follow up Procedure Dispose of the removed camera that is confirmed faulty 5 3 4 Replacing a VCN500 Prerequisites A VCN500 needs to be replaced A spare VCN500 of the same model is available and functional Impact on the System The operation of the monitoring system or devices may be interrupted Preparat...

Page 99: ...er mounting ears Figure 5 17 Placing a VCN500 2 Tighten the captive screws in the ears using a Phillips screwdriver to close the mounting ear buttons Figure 5 18 Installing a VCN500 Step 6 Reconnect the cables and the power plug of the VCN500 Step 7 Check whether the new VCN500 is working properly If the VCN500 power indicator is steady green the VCN500 is working properly If the network port ACT ...

Page 100: ...the System The monitoring system or devices in the area where the LAN switch is to be replaced may be shut down Preparations Tools Phillips screwdriver ESD gloves marker Materials spare LAN switch Document documents delivered with the LAN switch Skill requirement weak current engineer Procedure Step 1 Mark ports on the LAN switch and cables connected to the LAN switch Step 2 Remove the power plug ...

Page 101: ...WR1 PWR2 and SYS indicators of the LAN switch are on after power on the LAN switch is working properly End Follow up Procedure Dispose of the removed LAN switch that is confirmed faulty 5 3 6 Replacing the ECC500 Collector Prerequisites An ECC500 collector needs to be replaced A spare ECC500 collector of the same model is available and functional Impact on the System The monitoring of the correspo...

Page 102: ...move the faulty ECC500 Figure 5 20 Removing the faulty ECC500 collector Step 3 Install a new collector and tighten the screws in reverse order of Step 2 Step 4 Reconnect all cables based on the marks Step 5 Start the ECC500 collector and check that the new collector is working properly If the power indicator on the main control module of the ECC500 collector is on and the ECC500 collector is commu...

Page 103: ...ayout diagram Skill requirement weak current engineer For the diagrams and tables see the initial configuration parameter manual for the solution in use Procedure Step 1 Press and hold the power switch on the front panel of the RH2288 server for about 5s to power off the server and disconnect the power plug Step 2 Mark cables and ports on the RH2288 server using a marker Step 3 Remove all cables c...

Page 104: ...Optional Replacing an End Door Card Reader Prerequisites Install the card reader on the main entrance to the pre fab module A card reader needs to be replaced A spare card reader of the same model is available and functional Impact on the System None Preparations Tools adjustable wrench Phillips screwdriver protective gloves Materials spare access card and card reader Document initial configuratio...

Page 105: ...p 5 Secure the support and reinstall the baffle plate Step 6 Reset parameters by referring to the management system initial configuration guide Step 7 Check that the new card reader is working properly The card reader is working properly if the door can be opened using an access card End Follow up Procedure Dispose of the removed card reader that is confirmed faulty 5 3 8 2 Optional Replacing an E...

Page 106: ...Step 2 Remove the two screws at the bottom of the card reader and remove the front cover Figure 5 23 Removing the front cover Step 3 Remove the two screws that secure the card reader body Figure 5 24 Removing screws Step 4 Remove interconnection terminals from the card reader and remove the card reader body Step 5 Remove the two screws from the bottom of the new card reader and remove the front co...

Page 107: ...oring system End Follow up Procedure Dispose of the removed card reader that is confirmed faulty 5 3 8 3 Replacing an Exit Button Prerequisites An exit button needs to be replaced A spare exit button of the same model is available and functional Impact on the System None Preparations Tools insulation tape Phillips screwdriver flat head screwdriver protective gloves Materials spare exit button Docu...

Page 108: ...ables Step 3 Check whether the new exit button is working properly If the pre fab module door can be opened using the exit button and the door opening event is logged the new exit button is working properly End Follow up Procedure Dispose of the removed exit button that is confirmed faulty 5 3 8 4 Replacing an Electronic Lock Prerequisites An electronic lock needs to be replaced A spare electronic...

Page 109: ...l requirement weak current engineer Procedure Step 1 Use a Phillips screwdriver to loosen screws from the baffle plate of the electronic lock and remove the baffle plate as shown by 1 in Figure 5 26 Figure 5 26 Removing screws Step 2 Remove the terminals connected to the faulty electronic lock Step 3 Use a hex key to remove the screw under the electronic lock and remove the faulty electronic lock ...

Page 110: ...oor is open the electronic lock is working properly End Follow up Procedure Dispose of the removed electronic lock that is confirmed faulty 5 3 8 5 Replacing an Emergency Door Release Button Prerequisites The emergency door release button needs to be replaced A spare emergency door release button of the same model is available and functional Impact on the System None Preparations Tools insulation ...

Page 111: ... door release button Figure 5 28 Removing the emergency door release button Step 2 Install a new emergency door release button 1 Connect cables 2 Tighten screws on the base as shown by 1 in Figure 5 29 3 Install the glass panel as shown by 2 and 3 in Figure 5 29 4 Tighten screws as shown by 4 in Figure 5 29 Figure 5 29 Installing the emergency door release button Step 3 Check that the new emergenc...

Page 112: ...al Impact on the System None Preparations Tools Phillips screwdriver small sized flat head screwdriver protective gloves Materials key to the access controller box spare access controller Documents documents delivered with the access controller power supply and distribution system diagram initial configuration parameters for the management system Skill requirement weak current engineer For the dia...

Page 113: ...management system initial configuration table Figure 5 31 Position of the access controller DIP switch Step 4 Install the new access controller and reconnect the terminal blocks and network cable Install terminals on the left and right of the access controller based on the mapping between cable labels and the silk screens on the access controller Step 5 Secure the access controller Step 6 Switch o...

Page 114: ... protective gloves step ladder Phillips screwdriver Materials spare smoke detector Documents fire extinguishing device layout diagram standard Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the smoke detector inform the related administration department of the temporary downtime of the fire control system Aft...

Page 115: ...n the loop in parallel remove the terminal resistor from the faulty smoke detector and connect the resistor to the new smoke detector when you replace the smoke detector Step 4 Remove the screws on the base using a Phillips screwdriver and remove the base Step 5 Install the new base to the same position and reconnect the cables Step 6 Hold the new smoke detector body align the smoke detector indic...

Page 116: ...ector is working properly If the red indicator blinks once every 6s the smoke detector is working properly End Follow up Procedure Dispose of the removed smoke detector that is confirmed faulty 5 4 2 Replacing a Heat detector Standard Prerequisites A spare heat detector of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replace...

Page 117: ...el Step 2 Hold the heat detector and rotate it counterclockwise to remove it from the base Figure 5 34 Removing a heat detector Step 3 Remove cables from the base using a Phillips screwdriver As a terminal resistor is connected to the last heat detector in the loop in parallel remove the terminal resistor from the faulty heat detector and connect the resistor to the new heat detector when you repl...

Page 118: ...y If the red indicator blinks once every 6s the heat detector is working properly End Follow up Procedure Dispose of the removed heat detector that is confirmed faulty 5 4 3 Replacing the Gas Release Indicator Standard Prerequisites A spare gas release indicator of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Pre...

Page 119: ... shown in Figure 5 36 using a Phillips screwdriver and remove the panel Figure 5 36 Removing the screws Step 3 Remove the cables using a flat head screwdriver and label the cables Step 4 Remove the screws on the base using a Phillips screwdriver and remove the base Step 5 Install the new base in the same position Step 6 Reconnect cables in the same way Step 7 Secure the panel to the base Step 8 Sw...

Page 120: ...el End Follow up Procedure Dispose of the removed gas release indicator that is confirmed faulty 5 4 4 Replacing an Indoor Fire Alarm Horn Strobe Standard Prerequisites A spare fire alarm horn strobe of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tools Phillips screwdriver flat head screwdriver step...

Page 121: ...anel Step 2 Pry open a seam at the top clip using a flat head screwdriver to separate the top cover from the base Figure 5 38 Removing a fire alarm horn strobe Step 3 Remove the two cables using a Phillips screwdriver When removing cables clearly label the cables with its corresponding terminal ports Step 4 Remove the screws on the base using a Phillips screwdriver and remove the base Step 5 Insta...

Page 122: ...uishing system stops working during the replacement Preparations Tools needle nose pliers insulation tape protective gloves step ladder Materials spare fire alarm sounder cord end terminals Documents fire extinguishing device layout diagram standard Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the fire alar...

Page 123: ...Cutting off the power cables Step 4 Connect the input wires with the two wires polarity insensitive of the fire alarm sounder and wrap the connection points using insulation tape Cord end terminals are recommended if applicable Step 5 Install the new fire alarm sounder Step 6 Switch on the active and standby power supplies to the fire alarm control panel Step 7 Check whether the new fire alarm sou...

Page 124: ...ps screwdriver flat head screwdriver protective gloves Materials spare emergency start abort switch Documents fire extinguishing device layout diagram standard Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the emergency start abort switch inform the related administrative departments of the temporary downtim...

Page 125: ...switch in the same position Step 7 Connect the cables to the new emergency start abort switch using a flat head screwdriver Ensure that the polarities of the cables are correct Switch on the power supply only after verifying that the cables are correctly connected Step 8 Use a Phillips screwdriver to tighten the screws at the upper and lower parts of the new emergency start abort switch Step 9 Swi...

Page 126: ...parations Tools protective gloves step ladder Phillips screwdriver Materials spare fire alarm control panel batteries Documents fire extinguishing device layout diagram standard Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Procedure Step 1 Switch off the standby power supply to the fire alarm control panel Figure 5 42 Posit...

Page 127: ...ove cables from the fire alarm control panel batteries and remove the batteries Step 4 Install the new batteries to the proper positions of the fire alarm control panel Step 5 Connect battery cables to the fire alarm control panel in the same way Figure 5 44 Connecting battery cables Distinguish the positive and negative battery terminals when connecting battery cables Step 6 Use a Phillips screwd...

Page 128: ...arm control panel is off the new batteries are working properly End Follow up Procedure Dispose of the removed fire alarm control panel batteries that are confirmed faulty 5 4 8 Replacing a Fire Cylinder Standard Prerequisites A spare fire cylinder of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tool...

Page 129: ...tive departments of the temporary downtime of the fire extinguishing system After the replacement inform the administration department that the system has become operational Procedure Step 1 Switch off the active and standby power supplies to the fire alarm control panel Figure 5 46 Switching off the active and standby power supplies Step 2 Disconnect the interconnection cables between the electro...

Page 130: ...ent Issue 04 2018 01 05 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 122 Figure 5 47 Position of the interconnection cables Figure 5 48 Position of the cables to the solenoid valve Step 3 Disconnect the cables from the pressure announciator as shown in Figure 5 49 ...

Page 131: ...pressure announciator Step 4 Remove the high pressure hose and adapter of the fire cylinder using an adjustable wrench as shown by 1 and 2 in Figure 5 50 Figure 5 50 Removing the high pressure hose and adapter Step 5 Loosen the straps on the fire cylinder Step 6 Move the fire cylinder out of the installation position Step 7 Move the fire cylinder to the installation position using a pallet truck a...

Page 132: ...t impact or strike the fire cylinder during transportation or installation Assign sufficient people for transportation and installation if no auxiliary tool is available Keep the pressure gauge panel outwards so that people can view the reading Figure 5 51 Installing the fire cylinder straps 1 Fire cylinder straps Step 8 Connect cables of the electromagnetic valve to the interconnection terminal ...

Page 133: ...essure announciator Step 10 Reinstall the adapter and high pressure hose Step 11 Connect the cables between the electromagnetic valve and the fire alarm control panel Step 12 After installing the fire cylinder remove the safety pin on the fire cylinder Verify that the safety pin is removed after the system starts working properly otherwise the electromagnetic valve may fail to start and extinguish...

Page 134: ...5 AI Version 5 Components Replacement Issue 04 2018 01 05 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 126 Figure 5 53 Removing screws 2 Loosen the remaining three screws Figure 5 54 Positions of the screws 3 Remove the safety pin ...

Page 135: ...The fire cylinder has passed the air tightness test Tools and materials are ready All tools and materials except the camshaft device are provided by the charging station Extinguishant needs to be charged in the charging station Preparations Tools platform scale hose with a pressure tolerance greater than 2 5 MPa gate valve camshaft device pipe wrench adjustable wrench Materials extinguishant charg...

Page 136: ...vice 1 Camshaft device Step 2 Move the fire cylinder onto the platform scale and record the weight reading Step 3 Connect the fire cylinder with the extinguishant charging cylinder and nitrogen cylinder Figure 5 57 Connecting cylinders Step 4 Set the counterweight to the fire cylinder weight reading plus the weight of fire extinguishant to be charged put on the handle for the camshaft rod and push...

Page 137: ...ane 24 kg 40 ft Heptafluoropropane 48 kg Step 6 Open valve 3 to charge nitrogen into the fire cylinder until the pressure gauge reading reaches 2 5 MPa Then reset the camshaft to close the fire cylinder Step 7 Close valves 3 and 1 and remove the hose and camshaft device Step 8 Record the fire cylinder weight after the charging is complete and move the fire cylinder off the platform scale Step 9 Su...

Page 138: ...ps screwdriver Materials spare fire alarm control panel Documents delivered with the fire alarm control panel Skill requirement fire engineer Before replacing the fire alarm control panel inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administration department that the system has become operational Procedure...

Page 139: ...ted pipes and cables outside of the box Keep labels on the cables intact so that cables can be connected to the correct terminals later Step 6 Remove the screws using a Phillips screwdriver and take out the faulty fire alarm control panel Step 7 Install the new fire alarm control panel in the same position Step 8 Put the corrugated pipes and cables back to the box and reconnect the cables accordin...

Page 140: ... working properly If the power indicator is on and the alarm indicator is off the fire alarm control panel is working properly End Follow up Procedure Dispose of the removed fire alarm control panel that is confirmed faulty 5 4 11 Replacing an Emergency Light Standard Prerequisites A spare emergency light of the same model is available and functional Impact on the System None Preparations Tools st...

Page 141: ...3 Install a new emergency light tighten the screws on the box and plug the power cable Step 4 Press the TEST button on the emergency light panel to check whether the new emergency light is working properly If the new emergency light turns on it is working properly End Follow up Procedure Dispose of the removed emergency light that is confirmed faulty 5 5 Replacing Fire Extinguishing System Devices...

Page 142: ...rams see the initial configuration parameter manual for the solution in use Before replacing the smoke detector inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administrative departments that the system has become operational Procedure Step 1 Disconnect the battery cables and switch off the input circuit brea...

Page 143: ...onnect the battery cables to power on the panel Step 8 Check whether the new smoke detector is working properly 1 Disconnect the wiring terminals from the electric control head on the fire cylinder After the wiring terminals are disconnected from the electric control head the extinguishant control panel generates a FAULT RELAY alarm which is normal 2 Release smoke onto the smoke detector using a s...

Page 144: ...E Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the heat detector inform the related administrative departments of the temporary downtime of the fire extinguishant system After the replacement inform the administrative departments that the system has become operational Procedure Step 1 Disconnect the battery...

Page 145: ...connect the battery cables to power on the panel Step 8 Check whether the new heat detector is working properly 1 Disconnect the wiring terminals from the electric control head on the fire cylinder After the wiring terminals are disconnected from the electric control head the extinguishant control panel generates a FAULT RELAY alarm which is normal 2 Heat the heat detector using a heating device T...

Page 146: ...engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the warning signs indicator inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administrative departments that the system has become operational Procedure Step 1 Disconnect the battery cables and swi...

Page 147: ...ving the warning signs base Step 5 Install the new warning sign base in the same way and connect the cables Step 6 Install the warning sign cover Step 7 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables to power on the panel Step 8 Check whether the new warning signs indicator is working properly 1 Pull up the reset button on the pressure operate...

Page 148: ...shant control panel by pressing Reset on it Then reset the key to Enable Control leftward End Follow up Procedure Dispose of the removed warning signs indicator that is confirmed faulty 5 5 4 Replacing a StroBell CE Prerequisites A spare StroBell of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tools ...

Page 149: ...tem After the replacement inform the administration department that the system has become normal Procedure Step 1 Disconnect the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Remove the screws securing the StroBell using a hex key and remove the StroBell cover Figure 5 72 Removing the StroBell cover Step 3 Remove the StroBell cables and label the...

Page 150: ... the wiring terminals from the electric control head on the fire cylinder After the wiring terminals are disconnected from the electric control head the extinguishant control panel generates an alarm which is normal 2 Press the manual gas release button on the extinguishant control panel That the StroBell is triggered indicates that the StroBell works properly 3 Reset the manual gas release button...

Page 151: ...After the replacement inform the administration department that the system has become normal Procedure Step 1 Disconnect the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Remove the screws securing the buzzer cover and base using a flat head screwdriver Figure 5 74 Removing the screws securing the buzzer cover Step 3 Remove cables from the buzzer...

Page 152: ...ose of the removed buzzer that is confirmed faulty 5 5 6 Replacing the Extinguishant Discharge Abort CE Prerequisites A spare extinguishant discharge abort of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tools Phillips screwdriver flat head screwdriver Materials spare extinguishant discharge abort Do...

Page 153: ...bles are correctly connected Step 7 Install the new extinguishant discharge abort panel in the same way Step 8 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables to power on the panel Step 9 Check whether the new abort switch is working properly 1 Disconnect the wiring terminals from the electric control head on the fire cylinder After the wiring ...

Page 154: ...device layout diagram CE Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the fire cylinder inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administration department that the system has become normal Procedure Step 1 Disco...

Page 155: ... pressure operated switch hose from the container valve of the fire cylinder Step 6 Remove the screws securing the fire cylinder using a Phillips screwdriver and remove the fire cylinder fasteners Step 7 Remove the faulty fire cylinder from the installation position Step 8 Move the new fire cylinder to the installation position and tighten the fire cylinder fasteners Keep the pressure gauge panel ...

Page 156: ...Align the electric control head and the container valve and tighten the electric control head clockwise Step 12 Connect the interconnection terminals on the electric control head to the extinguishant control panel Step 13 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables to power on the panel End Follow up Procedure Dispose of the removed fire cy...

Page 157: ...em has become normal Procedure Step 1 Disconnect the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Move out the extinguishant control panel batteries Figure 5 77 Removing the extinguishant control panel batteries Step 3 Remove all cables connected to the terminals on the extinguishant control panel While removing the cables label the cables with ...

Page 158: ...e position Step 7 Put the corrugated pipes and cables back to the box and reconnect the cables according to labels Step 8 Put the batteries to the same position Step 9 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables to the extinguishant control panel Distinguish the positive and negative battery terminals when connecting battery cables Figure 5...

Page 159: ...acing Batteries for the Extinguishant Control Panel CE Prerequisites Spare extinguishant control panel batteries of the same model are available and functional Impact on the System None Preparations Tools protective gloves step ladder Materials spare extinguishant control panel batteries Documents fire extinguishing device layout diagram CE Skill requirement fire engineer For the diagrams see the ...

Page 160: ...he extinguishant control panel Step 4 Reconnect the battery cables to the extinguishant control panel and ensure that cables are connected to correct polarities Figure 5 81 Connecting battery cables Step 5 Check whether the new extinguishant control panel batteries are working properly End Follow up Procedure Dispose of the removed extinguishant control panel batteries that are confirmed faulty 5 ...

Page 161: ...he power plug of the emergency light Step 2 Remove the protective cover of the emergency light Step 3 Install a new emergency light Step 4 Secure the protective cover of the emergency light Step 5 Reconnect the power plug of the emergency light Step 6 Verify that the emergency light is working properly End Follow up Procedure Dispose of the removed emergency light that is confirmed faulty 5 6 Repl...

Page 162: ...les and switch off the input circuit breaker of the extinguishant control panel Step 2 Hold the smoke detector and rotate it counterclockwise to remove it from the base Figure 5 82 Removing a smoke sensor Step 3 Remove cables from the base using a Phillips screwdriver As a terminal resistor is connected to the last smoke detector in the loop in parallel remove the terminal resistor from the faulty...

Page 163: ...extinguishing system stops working during the replacement Preparations Tools protective gloves step ladder Phillips screwdriver Materials spare heat detector Document fire extinguishing device layout diagram CE Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the heat detector inform the related administration ...

Page 164: ... a Phillips screwdriver and remove the base Step 5 Install the new base to the same position and reconnect the cables Step 6 Insert the new heat detector into the base and rotate it clockwise until it locks in Step 7 Switch on the input circuit breaker of the extinguishant control panel and connect the cables to the battery Step 8 Check whether the new heat detector is working properly If the red ...

Page 165: ... system has become operational Procedure Step 1 Disconnect the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Loosen the screws securing the warning sign and its base using a Phillips screwdriver and remove the cover of the warning sign Figure 5 84 Removing screws Step 3 Remove the cables from the warning signs and label the cables Step 4 Remove t...

Page 166: ... strobe of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tools Phillips screwdriver step ladder Materials spare horn strobe Documents fire extinguishing device layout diagram CE Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Befo...

Page 167: ...ion As a terminal resistor is connected to the last horn strobe in the loop in parallel remove the terminal resistor from the faulty horn strobe and connect the resistor to the new horn strobe when you replace the horn strobe Figure 5 86 Removing cables from the horn strobe Step 4 Remove screws from the horn strobe base using a Phillips screwdriver and remove the base Step 5 Install the new horn s...

Page 168: ...the horn strobe is triggered indicates that the horn strobe works properly 3 Reset the manual gas release button 4 Flip the key to Enable Control counterclockwise rightward Reset the extinguishant control panel by pressing Reset on it Then reset key to Enable Control clockwise leftward End Follow up Procedure Dispose of the removed horn strobe that is confirmed faulty 5 6 5 Replacing an External H...

Page 169: ...e horn strobe inform the related administrative departments of the temporary downtime of the fire control system After the replacement inform the administration department that the system has become operational Procedure Step 1 Disconnect the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Remove screws from the horn strobe using a Phillips screwdr...

Page 170: ...bles Install the new base and cover Step 6 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables Step 7 Check that the new horn strobe is working properly 1 Disconnect the wiring terminals from the electrical actuator on the fire cylinder After the wiring terminals are disconnected from the electrical actuator the extinguishant control panel generate...

Page 171: ...s step ladder Materials spare horn strobe Documents fire extinguishing device layout diagram CE Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the fire alarm bell inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administr...

Page 172: ...bell base using a Phillips screwdriver and remove the base Step 5 Install the new base in the same way connect the cables and install the cover Step 6 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables Step 7 Check whether the new fire alarm bell is working properly 1 Flip the key to Enable Control rightward and set the access level of the extingu...

Page 173: ...rials spare extinguishant abort button Documents fire extinguishing device layout diagram CE Skill requirement fire engineer For the diagrams see the initial configuration parameter manual for the solution in use Before replacing the extinguishant abort button inform the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the a...

Page 174: ...shant abort button and remove the panel of the extinguishant abort button Figure 5 91 Disconnecting cables from the extinguishant abort button As a resistor is installed on the loop of the extinguishant abort button remove the resistor and connect the resistor to the corresponding terminals of the new extinguishant abort button when you replace the extinguishant abort button Step 4 Remove the scre...

Page 175: ...onnect cables to the correct terminals Step 7 Install the new extinguishant abort button panel in the same way Figure 5 93 Installing the extinguishant abort button Step 8 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables Step 9 Check whether the new extinguishant abort button is working properly 1 Disconnect the wiring terminals from the electri...

Page 176: ...key to Enable Control clockwise leftward End Follow up Procedure Dispose of the removed the extinguishant abort button that is confirmed faulty 5 6 8 Replacing Batteries for the Extinguishant Control Panel CE Prerequisites Spare extinguishant control panel batteries of the same model are available and functional Impact on the System None Preparations Tools protective gloves step ladder Materials s...

Page 177: ...Procedure Dispose of the removed extinguishant control panel batteries that are confirmed faulty 5 6 9 Replacing a Fire Cylinder CE Prerequisites A spare fire cylinder of the same model is available and functional Impact on the System The fire extinguishing system stops working during the replacement Preparations Tools pipe wrench pallet truck Phillips screwdriver adjustable wrench protective glov...

Page 178: ... the battery cables and switch off the input circuit breaker of the extinguishant control panel Step 2 Move the new fire cylinder using a pallet truck to a position adjacent to the pre fab module door Do not impact or strike the fire cylinder during transportation or installation Assign sufficient people for transportation and installation if no auxiliary tool is available Step 3 Remove the electr...

Page 179: ...e faulty fire cylinder from the installation position Step 8 Move the new fire cylinder to the installation position and tighten the straps Keep the pressure gauge panel outwards so that people can view the reading Step 9 Connect the hose to the pneumatic switch Wrap the threads with sealing tape to ensure air tightness Step 10 Connect the fire cylinder to the fire extinguishing pipeline Wrap the ...

Page 180: ...at the ejector is not reset may lead to extinguishant release The electrical actuator ejector is 11 mm long before being pressed down and 7 mm long after being pressed down Figure 5 96 Operating the electrical actuator ejector 2 Align the electrical actuator and the container valve and tighten the actuator clockwise Step 12 Switch on the input circuit breaker of the extinguishant control panel and...

Page 181: ...orm the related administrative departments of the temporary downtime of the fire extinguishing system After the replacement inform the administration department that the system has become operational Procedure Step 1 Switch off the input circuit breaker on the extinguishant control panel Step 2 Remove the cables from the battery and take out the battery Step 3 Remove all cables connected to the te...

Page 182: ...ccording to labels Step 8 Put the batteries to the same position Step 9 Switch on the input circuit breaker of the extinguishant control panel and connect the battery cables Step 10 Check whether the new extinguishant control panel is working properly If the power indicator is on and the alarm indicator is off the fire control panel is working properly End Follow up Procedure Dispose of the remove...

Page 183: ... the initial configuration parameter manual for the solution in use Procedure Step 1 Disconnect the power plug of the emergency light Figure 5 98 Removing the power plug Step 2 Remove the protective cover of the emergency light Step 3 Loosen the emergency panel using a flat head screwdriver and remove the panel Step 4 Remove screws from the emergency light base using a Phillips screwdriver and rem...

Page 184: ...opyright Huawei Technologies Co Ltd 176 Step 7 Reconnect the power plug of the emergency light Step 8 Press the red button on the emergency light to check whether the new emergency light is working properly If the new emergency light turns on it is working properly End Follow up Procedure Dispose of the removed emergency light that is confirmed faulty ...

Page 185: ...00 Procedure Step 1 Check whether the UPS is working properly Step 2 Check whether the ATS in the mains bus coupler cabinet switches to the other mains supply or the DG If the switchover fails manually start the DG within 5 minutes after the power outage occurs If the DG still cannot be started back up data immediately If the DG starts and supplies power normally find the cause of the power outage...

Page 186: ... are powered by two power supplies If one circuit breaker trips it does not affect the operation of importance devices However the situation needs to be handled promptly to avoid jeopardizing the long term stable running of the equipment Procedure Step 1 Promptly locate the control range of the circuit breaker that has tripped Step 2 Analyze the cause of the circuit tripping and switch on the circ...

Page 187: ...ture using a thermometer Step 3 Check whether the actual temperature exceeds the designed normal range If no replace the remote T H sensor for an air conditioner If yes go to Step 4 Step 4 Lower the temperature in the area Step 5 Refer to the section Temperature Alarms End Follow up Procedure Analyze the cause of the fault and work out and record the preventive measures 6 5 Emergency Operations fo...

Page 188: ...acing the LAN Switch If the LAN switch is working properly go to Step 4 Step 4 Check the signal cable connection between the LAN switch and the RH2288 server If any cable is not properly connected prepare and reconnect the cable and check whether the fault is rectified If cables are properly connected go to Step 5 Step 5 Check whether the cables to the digital distribution frame DDF in the pre fab...

Page 189: ...ard reader if the card reader is faulty Replace the exit button if the exit button is faulty Replace the electronic lock if the electronic lock is faulty Replace the access controller if the access controller is faulty Step 4 Optional Replace the emergency door release button after the fault is rectified End Follow up Procedure Analyze the cause of the fault and work out and record the preventive ...

Page 190: ...neer Procedure Step 1 Locate the alarm or alarm area in the management system Step 2 Check the internal situation in the video surveillance system If the video surveillance system indicates that everything is normal go to Step 5 If onsite fire is confirmed go to Step 3 Step 3 Check whether extinguishant has been released If extinguishant is being released contact the local maintenance engineer or ...

Page 191: ...ol panel outside the pre fab module Replace the smoke detector if the fire alarm control panel reports a single fire alarm smoke alarm but the VESDA does not report any alarm Replace the heat detector standard if the fire alarm control panel reports a single fire alarm heat detector alarm but the management system does not report any overtemperature alarm If the fire alarm control panel does not r...

Page 192: ...on and contact the personnel on duty or fire engineer Procedure Step 1 Locate the alarm or alarm area in the management system Step 2 Check the internal situation in the video surveillance system If the video surveillance system indicates that everything is normal go to Step 5 If onsite fire is confirmed go to Step 3 Step 3 Check whether extinguishant has been released If extinguishant is being re...

Page 193: ... you have any questions promptly contact Huawei technical support Figure 6 2 Position of the safety pin of an electromagnetic valve Step 5 Check whether there is an alarm on the fire alarm control panel outside the pre fab module Step 6 If the fire alarm control panel reports no double fire alarm check the cable connection from the fire alarm control panel to the management system If the cable con...

Page 194: ...uawei technical support to recharge the extinguishant after the fire has been extinguished If no extinguishant is released check the situation onsite and contact the fire engineer Step 4 Arrive at the site with necessary tools and communications devices as soon as possible open the external extinguishant control box and press the manual gas release button on the extinguishant control panel Remove ...

Page 195: ...orrect but the alarm persists go to Step 7 Step 7 Check the alarm settings for the extinguishant control panel in the management system If the settings are correct and the alarm disappears the troubleshooting ends If the settings are correct but the alarm persists contact Huawei technical support End Follow up Procedure Analyze the cause of the fault and work out and record the preventive measures...

Page 196: ...ect remove the dowel of the electric control head press the red button on the electric control head leave the site immediately and wait for the fire engineer to handle the situation If a pre fab module is on fire inside do not enter the module or stay around the module before the fire is extinguished After the fire is extinguished contact Huawei technical support Step 5 Check whether there is an a...

Page 197: ...nfidential Copyright Huawei Technologies Co Ltd 189 7 FusionModule1000 Emergency Exit Guide If an emergency occurs exit from the nearest inward opening emergency door Figure 7 1 shows how to open the door Figure 7 1 Opening the emergency door If a door status sensor is installed and the sensor is on press the exit button before opening the emergency door ...

Page 198: ...chnologies Co Ltd 190 A Acronyms and Abbreviations A AC alternating current ACC advanced cooling controller ATS automatic transfer switch C CE Conformite Europende D DDF digital distribution frame E ECC energy control center L LCD liquid crystal display P PoE power over Ethernet PDC power distribution cabinet PDU power distribution unit R rPDU rack power distribution unit ...

Page 199: ...lution Maintenance Guide 2016 05 AI Version AAcronyms and Abbreviations Issue 04 2018 01 05 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 191 U UPS uninterruptible power system V VCN video cloud node ...

Reviews: