FusionModule1000A40 IT Solution
Maintenance Guide (2016.05, AI Version)
3 Maintenance
Issue 04 (2018-01-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
37
Device
Operation
Check Standard
Troubleshooting
Buzzer
Flip the key to
Enable Control
on
the extinguishant
control panel
rightward. Press
Silence/Sound
Alarm
to start or
abort the buzzer.
Reset the key to
Enable Control
by
flipping it leftward.
The buzzer starts
and aborts normally,
and buzzes loud and
clear when it is
started.
1.
Check and reconnect cables
to the fire alarm bell.
2.
Replace the buzzer if the
fault persists.
Warning
sign
Pull up the reset
button on the
pressure operated
switch.
The warning sign
indicator is on.
Replace the warning signs.
3.4.6 Fire Extinguishing System (CE Tyco)
Semi-annual maintenance of the fire extinguishing system involves system commissioning.
Before the maintenance, inform the related administrative departments that the fire
extinguishing system will be maintained and stop working.
Before maintaining the fire extinguishing system, remove the electrical actuator from the
container valve of the fire cylinder. This prevents the extinguishant release due to
misoperations, and prevents accidental damage.
After the maintenance, reconnect the electrical actuator, and inform the administrative
departments that the fire extinguishing system has become operational.
Table 3-21
Semi-annual maintenance checklist for the fire extinguishing system
Device
Operation
Check Standard
Maintenance Guide
Fire
extinguishi
ng system
commission
ing
Commission the
fire extinguishing
system by
following the
instructions in the
Fire
Extinguishing
System
Commissioning
(CE)
section in the
commissioning
guide for the
solution in use.
Devices work
properly, and the
management system
displays related
alarms.
Replace the fire
extinguishing system
devices (CE).