![Honeywell touchpoint Pro Operating Instructions Manual Download Page 118](http://html.mh-extra.com/html/honeywell/touchpoint-pro/touchpoint-pro_operating-instructions-manual_149150118.webp)
MAN0923_Issue 3_04/15
Touchpoint Pro
Operating Instructions
118
8. Maintenance
4. Re-connect the field equipment by plugging the field terminals into the new module
5. If not already logged in, login with a valid administrator level user name
6. From the
System Status
screen select the
Extras
icon then
System
Configuration
7. Re-enter the password and press
Login
8. Initialise the Ring Network. Both the newly inserted module and the old module (in a faulty state) will
appear in the System Setup Tree
9. Highlight the old module which has been removed, and select
Replace
Module
from the popup menu
10. A list of compatible modules will be shown, including the newly added module
11. Select the new module and a confirmation screen will be shown
12. Select
Replace
to proceed
13. The configuration information will be automatically loaded into the new module
Note: This procedure should only be done to remove a faulty module from the system. The removed module
cannot be used in another system unless its state is set back to Unconfigured.
Note: A new AIM mV module will require calibration.