
FUEL SYSTEM (PGM-FI)
5-81
Route the wires
properly (page 1-
24).
Route the throttle cables properly.
Connect the throttle cables to the throttle pipe.
Install the right handlebar switch housing (page 13-
11).
Tighten the nuts securely.
Check the throttle operation and grip freeplay (page
3-6).
THROTTLE BODY
REMOVAL
Remove the throttle body from the air cleaner hous-
ing (page 5-67).
Loosen the lock nuts and disconnect the throttle
cables from the throttle drum.
Loosen the insulator band screws and remove the
insulators.
Mark each insulator to be sure of their insulator
bands direction for reassembly.
THROTTLE CABLES
NUTS
THROTTLE CABLES
LOCK NUTS
INSULATORS
Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
email: [email protected]