
FUEL SYSTEM (PGM-FI)
5-75
Connect the TP sensor 3P (Black) connector.
Connect the IDC solenoid valve 2P (Gray) connector.
Install the IAT sensor with a new O-ring and tighten
the screws securely.
Connect the IAT sensor 2P (Gray) connector.
INSTALLATION
Refer to the wires
properly
(page 1-24).
Route the throttle cables to the frame properly, then
install the air cleaner housing with the throttle body
from the left side.
• Be careful not to damage the harness and hoses.
• Make sure each insulator is firmly installed to the
intake port.
3P (Black) CONNECTOR
2P (Gray) CONNECTOR
2P (Gray) CONNECTOR
IAT SENSOR
O-RING
SCREW
AIR CLEANER HOUSING
Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
email: [email protected]