Tables and Overviews | Functions of the TNC 640 and the iTNC 530 compared
21
HEIDENHAIN | TNC 640 | Conversational Programming User's Manual | 10/2017
939
Function
TNC 640
iTNC 530
Circle programming with polar
coordinates
The incremental rotation angle
IPA
and the direction of rotation
DR
must have the same sign. Other-
wise, an error message will be
issued
The algebraic sign of the direc-
tion of rotation is used if the sign
defined for
DR
differs from the one
defined for
IPA
Tool radius compensation on circular
arc or helix with angular length = 0
The transition between the
adjacent elements of the arc/helix
is generated. Also, the tool axis
motion is executed right before
this transition. If the element is the
first or last element to be correct-
ed, the next or previous element is
dealt with in the same way as the
first or last element to be correct-
ed
The equidistant line of the arc/helix
is used for generating the tool path
Compensation of tool length in the
position display
The values
L
and
DL
from the tool
table and the value
DL
from the
TOOL CALL
block are taken into
account in the position display
The values
L
and
DL
from the tool
table are taken into account in the
position display
SLII Cycles 20 to 24:
Number of definable contour
elements
Max. 16384 blocks in up to 12
subcontours
Max. 8192 contour elements
in up to 12 subcontours, no
restrictions for subcontour
Define the working plane
Tool axis in
TOOL CALL
block
defines the working plane
The axes of the first positioning
block in the first subcontour
define the working plane
Position at end of SL cycle
With the
posAfterContPocket
(no. 201007) parameter, you can
define whether the end position
is above the last programmed
position, or whether the tool
moves to clearance height in
the tool axis
If the tool moves to clearance
height in the tool axis,
both coordinates must be
programmed with the first
traverse movement
With MP7420, you can define
whether the end position is
above the last programmed
position, or whether the tool
moves only to clearance height
in the tool axis
If the tool moves to clearance
height in the tool axis,
one coordinate must be
programmed with the first
traverse movement
Summary of Contents for TNC 640
Page 4: ......
Page 5: ...Fundamentals ...
Page 36: ...Contents 36 HEIDENHAIN TNC 640 Conversational Programming User s Manual 10 2017 ...
Page 67: ...1 First Steps with the TNC 640 ...
Page 90: ......
Page 91: ...2 Introduction ...
Page 130: ......
Page 131: ...3 Operating the Touchscreen ...
Page 144: ......
Page 145: ...4 Fundamentals File Management ...
Page 206: ......
Page 207: ...5 Programming Aids ...
Page 236: ......
Page 237: ...6 Tools ...
Page 281: ...7 Programming Contours ...
Page 333: ...8 Data Transfer from CAD Files ...
Page 355: ...9 Subprograms and Program Section Repeats ...
Page 374: ......
Page 375: ...10 Programming Q Parameters ...
Page 478: ......
Page 479: ...11 Miscellaneous Functions ...
Page 501: ...12 Special Functions ...
Page 584: ......
Page 585: ...13 Multiple Axis Machining ...
Page 650: ......
Page 651: ...14 Pallet Management ...
Page 664: ......
Page 665: ...15 Batch Process Manager ...
Page 673: ...16 Turning ...
Page 713: ...17 Manual Operation and Setup ...
Page 797: ...18 Positioning with Manual Data Input ...
Page 803: ...19 Test Run and Program Run ...
Page 843: ...20 MOD Functions ...
Page 881: ...21 Tables and Overviews ...