
Information for OEM and Setup users | Setup
Only if serial interface has been selected
The
Standard
and
Steinwald
data formats transfer measured values only
when the following axis names are assigned: X, Y, Z, Q, R, D, L, W, A, C, f,
Lx, Ly, or Lz.
The minimum, maximum, and range values are transferred only if the
axis names X, Y, or Q are assigned.
Parameter
Explanation
Data format for data transfer
Selection of the data format for measured value output
Settings:
Standard
Steinwald
MyFormat1
(template for copying)
Any data formats you have defined yourself
Default value:
Standard
Data format for touch-probe-
triggered data transfer
Selection of the data format for measured value output
Settings:
Standard
Steinwald
MyFormat1
(template for copying)
Any data formats you have defined yourself
Default value:
Standard
Data format for continuous data
transfer
Selection of the data format for measured value output
Settings:
Standard
Steinwald
MyFormat1
(template for copying)
Any data formats you have defined yourself
Default value:
Standard
Data format for switching-
function-triggered data transfer
Selection of the data format for measured value output.
You must assign a digital input for the
Trigger measured value
output
switching function.
"Switching functions", Page 140
Settings:
Standard
Steinwald
MyFormat1
(template for copying)
Any data formats you have defined yourself
Default value:
Standard
II
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 06/2022
147
Summary of Contents for GAGE-CHEK 2000
Page 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 06 2022...
Page 3: ...I General information...
Page 7: ...1 Fundamentals...
Page 14: ...2 Safety...
Page 19: ...3 Basic operation...
Page 43: ...II Information for OEM and Setup users...
Page 48: ...1 Transport and storage...
Page 54: ...2 Mounting...
Page 60: ...3 Installation...
Page 72: ...4 Commissioning...
Page 121: ...5 Setup...
Page 150: ...6 File management...
Page 157: ...7 Settings...
Page 172: ...8 Servicing and maintenance...
Page 184: ...9 Removal and disposal...
Page 186: ...10 Specifications...
Page 194: ......
Page 195: ...III Information for the Operator user...
Page 240: ...14 What to do if...