91
3-6-4 Adjustment of thread cutting stopper (except for Rev.A)
1. Adjust the thread cut timing.
Please refer to [3-6-3 Adjustment of thread cut timing].
2.Turn upper shaft to set dial disk to [
C (275 degrees)
].
3. Keep the lever down.
4. Insert 0.2mm thickness gauge between cam and roller and
adjust the clearance [
0.2mm
] between cam and roller by
adjusting screw.
)
(To be sure that cam and roller are contacted with
thickness gauge and nogap.)
5. Tighten lock nut.
6. On checking the clearance [
0.2mm
] between cam and
roller by using 0.2mm thikness gauge.
If OK, all the procedure is done.
Summary of Contents for HCS2-1201-30
Page 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Page 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Page 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Page 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Page 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Page 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Page 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Page 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Page 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Page 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...