3
Index
page
For safe adjustment and repair 2
Index
3
Special tool, Measuring equipment, Other 8
1 Outline of mechanism
1-1 Placement of key mechanical parts
12
1-2 Placement of key electronic parts
14
2 Outer covers
2-1 Removal of outer covers
15
3 Mechanical mechanism
3-1 Basic maintenance
3-1-1 Maintenance of thread path
19
3-1-2 Fixing of needle
21
3-1-3 Selection of thread
22
3-1-4 Relation between needle and upper thread
23
3-2 Fixed head
3-2-1 Exchange of crank
24
3-2-2 Exchange of rod
28
3-2-3 Adjustment of the lowest needle point
29
3-2-4 Exchange of needle bar driver
30
3-2-5 Adjustment of fixing of jump solenoid
32
3-2-6 Exchange of take-up lever cam
34
3-2-7 Exchange of roller shaft ass’y 36
3-2-8 Adjustment of take-up lever timing
37
3-2-9 Exchange of pressure foot cam
38
3-2-10 Check of height of pressure foot
39
3-2-11 Exchange of pressure foot
40
3-2-12 Adjustment of height of pressure foot guide bar
41
3-2-13 Exchange of pressure foot link and block
42
3-2-14 Exchange of pressure foot drive lever
43
3-2-15 Exchange of pressure foot guide
46
3-2-16 Exchange of pulse motor for pressure foot
48
3-2-17 Adjustment of pressure foot bracket ass’y
50
3-2-18 Exchange of thread catcher
51
Summary of Contents for HCS2-1201-30
Page 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Page 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Page 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Page 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Page 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Page 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Page 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Page 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Page 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Page 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...