36
3-2-7 Exchange of roller shaft ass’y
1. Remove take-up lever crank ass’y.
Push take-up lever drive shaft by slender shaft.
(Hexagon wrench etc.)
2.Exchange roller shaft ass’y.
<Spanner> 7mm, 8mm
3. Insert bering positioning gauge [
4.85mm
] between bering
and bering , and then tighten roller shaft ass’y.
Please adjust roller shaft for machine front side ways.
This roller shaft ass’y is eccentricity.
Turn lean screw and just touch roller to gauge.
Bering positioning gauge [
4.85mm
]
4. Return take-up lever crank ass’y to previous place to finish.
Please push to arrow ways until stop.
Summary of Contents for HCS2-1201-30
Page 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Page 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Page 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Page 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Page 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Page 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Page 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Page 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Page 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Page 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...