3
7
3-2-8
Adjustment of take-up lever timing
1. Loosen screw on fasten collar for take-up lever cam.
2. Set dial disc to
[10 degrees]
.
3. Insert positioning pin from right side.
4. Turn take up lever cam slowly and insert positioning pin
into pin groove.
pin groove
5. Loosen screw.
<Important>
Rotate the Take up lever cam clockwise until pin
ditch touches to positioning pin then tighten the screw.
(No gap between take-up lever cam and crank)
6. Pull out positioning pin.
7. Turn upper shaft and set dial disc to [
C
] to finish.
Summary of Contents for HCS2-1201-30
Page 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Page 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Page 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Page 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Page 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Page 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Page 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Page 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Page 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Page 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...