45
11. Adjust position of pressure foot guide plate A ass’y.
<Caution>
Make sure that pressure foot guide plate A ass’y is mount
perpendicular and parallel to the body.
<Spanner> 7mm
12. Adjust the height of pressure foot guide bar.
Please refer to [3-2-12 Adjustment of height of pressure
foot guide bar].
13. Assemble the upper rail of moving head.
Please refer to [3-3-1 Assemble the upper rail of moving
head].
14. Assemble the face plate.
15. Install parts in reverse order to finish.
For adjustment of fixing of each unit, please refer to
process to adjust fixing of each unit.
90 degrees
Summary of Contents for HCS2-1201-30
Page 1: ...Maintenance Manual for Embroidery Machine HCS2 1201 30 Version 2 3 HappyJapan Inc...
Page 154: ...153 5 1 1 Electrical connection diagram except for Rev A...
Page 155: ...154 5 1 1 Electrical connection diagram except for Rev A...
Page 156: ...155 5 1 2 List of electrical connection diagrams except for Rev A...
Page 157: ...156 5 1 3 Electrical connection diagram for Rev A...
Page 158: ...157 5 1 3 Electrical connection diagram for Rev A...
Page 159: ...158 5 1 4 List of electrical connection diagrams for Rev A...
Page 160: ...159 5 2 1 Connection of inverter 100V Inverter set...
Page 161: ...160 5 2 2 Connection of inverter 200V Inverter set...
Page 165: ...160c HCD8116 TP switch board ass y 6 5 265 2 1 6 7 257...