38
JUPITER CM-4400 Control Module Installation and Operating Manual
Section 2 — Hardware Installation
Figure 4. Jupiter AccuSwitch application - Connection to Crosspoint Bus Router
Follow these steps to install the CM-4400 in a rack:
1.
Position the CM-4400 on the rack close to the devices that it will control.
Note
Grass Valley recommends that a second person help hold the control module
(CM) in place while it is secured to the frame.
2.
Install the screws into the Rack-Mounting holes on the front of the CM-
4400.
Do not block the CM-4400’s ventilation openings on both sides of the
CM. If necessary, rack mount support must be cut shorter to avoid
blocking the airflow. The chassis fan and ventilation openings are
shown in
Figure 5 on page 39
.
CM-4400
Control
Module
CC 2010 Matrix (Crosspoint bus)
cables.
Apex,
Concerto
§
,
and Trinix routers
§§
House SMPTE
time code required
for deterministic
switching
Crosspoint bus
Crosspoint Bus port
For jumper and switch
setting information, re-
fer to the installation
manual supplied with
the router.
House sync
required for
vertical inter-
val switching.
CB 3000 Control Buffer
May be required when more than 50 matrix
boards are installed in switcher.
§
Concerto requires Crosspoint Bus Adapter and
CRS−MC−C2 Controller Board.
LAN
¶
¶
Summary of Contents for JUPITER -
Page 10: ...10 JUPITER CM 4400 Control Module Installation and Operating Manual Preface ...
Page 30: ...30 JUPITER CM 4400 Control Module Installation and Operating Manual ESD Protection ...
Page 248: ...248 JUPITER CM 4400 Control Module Installation and Operating Manual Section 9 Force Unlock ...
Page 310: ...4 JUPITER CM 4400 Control Module Installation and Operating Manual Index ...