JUPITER CM-4400 Control Module Installation and Operating Manual
37
Section
2
Hardware Installation
Unpacking and Inspection
Before unpacking the equipment, inspect the shipping carton for evidence
of freight damage. Notify the carrier and Grass Valley if the contents have
been damaged. Retain all shipping cartons and padding material for
inspection by the carrier.
Do NOT return damaged merchandise to Grass Valley until an appropriate
claim has been filed with the carrier and a material return authorization
number has been received from Grass Valley.
Note
If your Jupiter equipment was purchased from Grass Valley as a “turnkey”
system, you may wish to refer to the Jupiter Getting Started Guide. This
booklet provides an abbreviated version of the information in this section and
is available on Grass Valley’s Web site.
Verifying 110 or 230 VAC Selection
Most panels are auto sensing; otherwise, power line adjustments are nor-
mally made at the factory, based on the geographical location of the cus-
tomers’ facility. However, verifying these settings before applying power is
a good practice.
File Server
Verify that the File server has the correct mains voltage setting. The
minimum specifications for the File server can be found in
File Server
Minimum Specifications
on page 279
.
Rack Mounting
Grass Valley recommends that each CM-4400 be installed close to the
devices that it will control, which will reduce system cabling. An example
system diagram is shown in
Figure 4 on page 38
.
Summary of Contents for JUPITER -
Page 10: ...10 JUPITER CM 4400 Control Module Installation and Operating Manual Preface ...
Page 30: ...30 JUPITER CM 4400 Control Module Installation and Operating Manual ESD Protection ...
Page 248: ...248 JUPITER CM 4400 Control Module Installation and Operating Manual Section 9 Force Unlock ...
Page 310: ...4 JUPITER CM 4400 Control Module Installation and Operating Manual Index ...