Part No. 1268494
S-100 • S-105 • S-120 • S-125
3 - 25
March 2017
Section 3 • Repair Procedures
PLATFORM COMPONENTS
2-6
Platform Overload Recovery
Message (software V3.14 and
later)
If the ground controls LCD screen displays
OVERLOAD RECOVERY, the emergency lowering
system has been used while the platform was
overloaded.
How to Clear the Platform
Overload Recovery Message
Note: This message shall be cleared by a person
trained and qualified on the troubleshooting and
repair of this machine.
Note: Use the following chart to identify the
description of each LCD screen control button
used in this procedure.
1 Turn the key switch to platform control. Start
the engine and level the platform.
2 Press and hold the
enter
button on the ground
sontrol panel while turning the key switch to
ground controls. Hold the
enter
button for
approximately 5 seconds.
Plus
Minus
Previous
Enter
3 Press the buttons on the ground
controls in the following sequence:
(plus)(minus)(minus)(plus)
.
4 Press the
enter
or
previous
button on the LCD
screen until CLEAR OVERLOAD RECOVERY
is displayed.
5 Press the
plus
button or
minus
button to select YES. Then press
the buttons in following sequence:
(plus)(plus)(plus)(minus)
and press the
enter
button to accept.
Note: The passcode buttons
(plus)(plus)(plus)(minus)
must be entered in
the proper sequence before the
enter
button is
pressed.
6 Press the
enter
or
previous
button on the LCD
screen until EXIT is displayed.
7 Press the
plus
button or
minus
button to select
YES and then press the
enter
button.
8 Turn the key switch to the off position.
Summary of Contents for S-100
Page 246: ...March 2017 Section 6 Schematics 6 22 Safety Circuit Schematic 6 21 ...
Page 259: ...Section 6 Schematics March 2017 6 35 6 36 Electrical Schematic Generator Options ...
Page 262: ...March 2017 Section 6 Schematics 6 38 6 37 Electrical Schematic 12 kW Generator welder option ...
Page 264: ...March 2017 Section 6 Schematics 6 40 Perkins 1104D 44T Engine Electrical Schematic 6 39 ...
Page 265: ...Section 6 Schematics March 2017 6 41 Perkins 854F 34T Engine Electrical Schematic 6 42 ...
Page 268: ...March 2017 Section 6 Schematics 6 44 Perkins 854F 34T Engine Harness 6 45 ...
Page 269: ...Section 6 Schematics March 2017 6 45 Deutz TD2011L04i Engine Electrical Schematic 6 46 ...
Page 271: ...Section 6 Schematics March 2017 6 47 Deutz TD2 9 Engine Electrical Schematic 6 48 ...
Page 274: ...March 2017 Section 6 Schematics 6 50 Deutz TD2 9 Engine Electrical Harness 6 51 ...
Page 276: ...March 2017 Section 6 Schematics 6 52 6 53 Hydraulic Schematic 12 kW Generator welder option ...