4 - 36
S-100 • S-105 • S-120 • S-125
Part No. 1268494
March 2017
Section 4 • Diagnostic Codes
Control System Fault Codes
How to Clear Boom Safety
Switch Faults
Note: Beginning with software release 3.0, the
boom envelope switches will latch and faults
must be reset in software or through the use
of the TCON LCD. They will not clear by re-
powering the machine.
Note: There are two methods to reset the faults,
by using Web GPI or through the menu available
on the TCON LCD.
Using Web GPI
1 Connect the device containing the WEB GPI
software to the TCON with an RS-232 cable.
2 Select the Safety folder, then the Fault Status
screen.
3 Change any safety switch drop down menus
displaying
fault
to
ok
. Press
send
.
4 Exit Web GPI.
Using the TCON LCD
Note: Take care when using this method to avoid
resetting threshold defaults.
1 With the key switch off, press and hold the
button and turn the key switch to the on
position. Release the
button after five
seconds and press the
buttons.
2 Press the button until
clear
all
safety
switch
faults
appears.
3 Select
yes
,
then press the
button.
4 Press the button until
exit
appears.
5 Select
yes
,
then press the
button.
Note: This clears all latching faults, not standard
faults.
DIAGNOSTIC CODES
Summary of Contents for S-100
Page 246: ...March 2017 Section 6 Schematics 6 22 Safety Circuit Schematic 6 21 ...
Page 259: ...Section 6 Schematics March 2017 6 35 6 36 Electrical Schematic Generator Options ...
Page 262: ...March 2017 Section 6 Schematics 6 38 6 37 Electrical Schematic 12 kW Generator welder option ...
Page 264: ...March 2017 Section 6 Schematics 6 40 Perkins 1104D 44T Engine Electrical Schematic 6 39 ...
Page 265: ...Section 6 Schematics March 2017 6 41 Perkins 854F 34T Engine Electrical Schematic 6 42 ...
Page 268: ...March 2017 Section 6 Schematics 6 44 Perkins 854F 34T Engine Harness 6 45 ...
Page 269: ...Section 6 Schematics March 2017 6 45 Deutz TD2011L04i Engine Electrical Schematic 6 46 ...
Page 271: ...Section 6 Schematics March 2017 6 47 Deutz TD2 9 Engine Electrical Schematic 6 48 ...
Page 274: ...March 2017 Section 6 Schematics 6 50 Deutz TD2 9 Engine Electrical Harness 6 51 ...
Page 276: ...March 2017 Section 6 Schematics 6 52 6 53 Hydraulic Schematic 12 kW Generator welder option ...