Part No. 1268494
S-100 • S-105 • S-120 • S-125
3 - 43
March 2017
Section 3 • Repair Procedures
30 Remove and label the top and side wear pads
of the number 3 boom tube at the pivot end
of the boom. Do not remove the bottom wear
pads.
Note: Pay careful attention to the location and
amount of shims used with each wear pad.
31 Remove and label the top and side wear pads
from the number 2 boom tube at the platform
end of the boom. Do not remove the bottom
wear pads.
Note: Pay careful attention to the location and
amount of shims used with each wear pad.
32 Attach a lifting strap from an overhead crane to
the number 3 boom tube at the platform end of
the boom.
33 Support and slide the number 3 boom tube out
of the number 2 boom tube. When the number
3 boom tube is approximately halfway removed,
remove the bottom wear pads from the number
2 boom tube at the platform end of the boom.
Crushing hazard. The number
3 boom tube may become
unbalanced and fall when it is
removed from the number 2 boom
tube if it is not properly supported
and attached to the overhead
crane.
Note: During removal, the overhead crane strap
will need to be adjusted for proper balancing.
34 Remove and label the top and side wear pads
from the number 2 boom tube at the pivot end
of the boom. Do not remove the bottom wear
pads.
Note: Pay careful attention to the location and
amount of shims used with each wear pad.
35 Remove and label the top and side wear pads
from the number 1 boom tube at the platform
end of the boom. Do not remove the bottom
wear pads.
Note: Pay careful attention to the location and
amount of shims used with each wear pad.
36 Attach a lifting strap from an overhead crane to
the number 2 boom tube at the platform end of
the boom.
37 Support and slide the number 2 boom tube out
of the number 1 boom tube. When the number
2 boom tube is approximately halfway removed,
remove the bottom wear pads from the number
1 boom tube at the platform end of the boom.
Crushing hazard. The number
2 boom tube may become
unbalanced and fall when it is
removed from the number 1 boom
tube if it is not properly supported
and attached to the overhead
crane.
Note: During removal, the overhead crane strap
will need to be adjusted for proper balancing.
BOOM COMPONENTS
Summary of Contents for S-100
Page 246: ...March 2017 Section 6 Schematics 6 22 Safety Circuit Schematic 6 21 ...
Page 259: ...Section 6 Schematics March 2017 6 35 6 36 Electrical Schematic Generator Options ...
Page 262: ...March 2017 Section 6 Schematics 6 38 6 37 Electrical Schematic 12 kW Generator welder option ...
Page 264: ...March 2017 Section 6 Schematics 6 40 Perkins 1104D 44T Engine Electrical Schematic 6 39 ...
Page 265: ...Section 6 Schematics March 2017 6 41 Perkins 854F 34T Engine Electrical Schematic 6 42 ...
Page 268: ...March 2017 Section 6 Schematics 6 44 Perkins 854F 34T Engine Harness 6 45 ...
Page 269: ...Section 6 Schematics March 2017 6 45 Deutz TD2011L04i Engine Electrical Schematic 6 46 ...
Page 271: ...Section 6 Schematics March 2017 6 47 Deutz TD2 9 Engine Electrical Schematic 6 48 ...
Page 274: ...March 2017 Section 6 Schematics 6 50 Deutz TD2 9 Engine Electrical Harness 6 51 ...
Page 276: ...March 2017 Section 6 Schematics 6 52 6 53 Hydraulic Schematic 12 kW Generator welder option ...