ii
5322A
Calibration Manual
High Resistance Source Meters 5 kV Adjustment (Optional).............. 36
Voltmeter adjustment HVR V01-HVR V09 ................................... 36
Ammeter Adjustment HVR I01 ..................................................... 38
10 GW Input Resistance Calibration ............................................ 39
High Resistance Source Meters 1.5 kV Adjustment ........................... 39
Voltmeter Adjustment HVR V01-HVR V04 ................................... 40
Ammeter Adjustment HVR I01 ..................................................... 41
DC Voltage Calibrator Adjustment (Optional) ..................................... 42
AC Voltage Calibrator Adjustment (Optional)...................................... 43
DC Multimeter Adjustment .................................................................. 45
DC Ranges for 10 V, 100 V, 1000 V Calibration .......................... 45
DC Range 5000 V Adjustment ..................................................... 46
DC Current Ranges 0.3 A, 3 A, 30 A Adjustment......................... 48
AC Multimeter Adjustment .................................................................. 49
AC Ranges 10 V, 100 V, 1000 V Adjustment ............................... 50
AC Range 5000 V Adjustment...................................................... 51
AC Current Ranges 0.3 A, 3 A, 30 A Adjustment ......................... 52
RCD Trip Current Adjustment ............................................................. 53
Leakage Current Adjustment .............................................................. 56
HV Probes Adjustment........................................................................ 57
High Resistance Multiplier Adjustment................................................ 58
Loop & Line Impedance Adjustment ................................................... 58
DC HIPOT Leakage Current Adjustment ............................................ 58
AC HIPOT Leakage Current Adjustment ............................................ 60
HIPOT Ripple Adjustment ................................................................... 61
Product Configuration ......................................................................... 62
Basic Verification Step.................................................................. 62
Conditions..................................................................................... 64
Ground Bond Resistance and Loop/Line Resistance
Verification Procedure......................................................................... 64
Low Resistance Source Verification.................................................... 66
5 kV and 1.5 kV High Resistance Source ........................................... 67
Voltage Calibrator ............................................................................... 70
Leakage Current ................................................................................. 71
RCD Function...................................................................................... 72
METER ............................................................................................... 73
High Voltage Tests.............................................................................. 75
Verification Tables............................................................................... 77
List of Error Messages............................................................................... 88
Maintenance .............................................................................................. 90
Clean the Ground Bond Resistance and Loop/Line
Impedance Relays .............................................................................. 91
Access the Fuses................................................................................ 91
Line-Power Fuse .......................................................................... 91
Measurement Input Fuses............................................................ 92