5322A
Calibration Manual
62
Verification
This section describes the procedure to verify the Product parameters.
The required verification equipment is in
Product Configuration
Test the Product from the front panel terminals. Let the Product warm up for 1 hour before you
do the performance verification. Keep the temperature around the Product stable for a
minimum of 4 hours prior to the test.
Basic Verification Step
The basic, top-level steps of the performance verification test are:
Ground Bond Resistance Decade
• Two wire resistance
• Four wire resistance
• Open resistance
Low resistance source
• Two-wire, low-resistance source
• Four-wire, low-resistance source
• SHORT two-wire resistance
• SHORT four-wire resistance
Table 17. Required Verification Equipment
Required Instrument
Recommended Model
Digital Multimeter
Fluke Calibration 8588A or similar model
Teraohmmeter
Quadratech 1865
Multi-product Calibrator
Fluke Calibration 5502A, 5522A or similar model
HIPOT Tester
Chroma 19052
Counter
Keysight 53131A or equivalent
10 kV Divider
5320A/5322A Accessory