Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
71
44..1111
IInnssttaalllliinngg TThhee U
UP
PS
S IInntteerrnnaall B
Baatttteerriieess
CAUTION
The UPS internal batteries are heavy. Each battery tray holds two rows of five batteries. Use caution when
handling the heavy battery trays.
To install the battery trays into the UPS cabinet:
1.
Verify that the circuit breakers on the UPS rear panel are in the OFF (O) position ).
2.
Remove the eight screws on the battery cover plate and retain. Remove the plate and retain.
Figure 55. Removing the UPS Battery Cover Plate
3.
Slide the battery trays into the cabinet for two battery string installations and for single-string installations.
Verify that each tray is properly aligned before sliding the tray in.
NOTE
When installing single-string battery trays for BladeUPS 5.0 kVA, always install the
single-string trays in the bottom battery compartment.
4.
When a tray is fully installed, tuck the plastic handle on the end of the tray into place.
Figure 56. Installing the UPS Battery Trays (Two Battery Strings)
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...