Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 46. Front Rail Screw Positions for the UPS
Position 1
Position 9
Mounting
Bracket
Top of Rail
Position 12
Position 4
Bottom of Rack
or Top of Other
Cabinet
Bottom of Rail
2.
Pre-assemble four M6 hex nuts to the rail assembly:
Assemble two of the nuts and the rear hold-down bracket and finger-tighten only. Assemble the other two
nuts to the rail and finger-tighten only.
Repeat for the other rail.
Figure 47. Installing the Rail Hardware (Right Rail Assembly Shown)
M6 Hex
Nuts
Front
Rear
Rear Hold-Down
Bracket
NOTE
Verify that the holes in the rail align properly with the hole pattern in the rack. If the rack
has square holes, verify that the studs on the end of the rail align within the square
holes.
3.
Using two M5 machine screws, attach the rail to the front of the rack and finger-tighten only.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...