84
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 68. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)
Plug Retainer
1
2
3
44..1155
S
Siinnggllee P
Paarraalllleell R
Reeaaddyy U
UP
PS
S IInnssttaallllaattiioonn
CAUTION
Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk of
electrical shock.
NOTE
Do not make unauthorized changes to the UPSs; otherwise, damage may occur to your
equipment and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a BladeUPS Bar.
2.
Switch off utility power to the distribution point where the parallel-ready UPS system will be connected.
Be absolutely sure there is no power.
3.
Verify that all circuit breakers are in the OFF (O) position.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...