Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 22. Removing the Conduit Landing Plate
Bottom Entry Rack
Ferrite Assembly (mounted)
4.
Use a Greenlee
®
punch to provide one or more holes in the conduit landing plate to accommodate the
input and output wiring from the utility to the BladeUPS Bar.
5.
Replace the conduit landing plate, and attach approved electrical conduit to the plate.
6.
Pull approved electrical conductors to the system and connect the input, output, and ground wires to the
BladeUPS Bar terminal block and route the three input phases and the input neutral through the mounted
or loosened ferrite assembly (see
).
Figure 23. BladeUPS Bar Terminal Block
Ground
Bottom Entry Terminal Block
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...