Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
55
NOTE
The load connector breaker controls the load (RPM) connector only, not the output
power cord.
2.
Switch on utility power where the UPS is connected.
3.
Remove the breaker ties from the battery circuit breakers.
4.
Switch the UPS input circuit breaker on each UPS to the ON ( | ) position.
5.
Wait for the front panel display on each UPS to illuminate.
The
indicator flashes on each UPS.
6.
Check each UPS front panel display for active alarms or notices (other than “Batteries Disconnected”).
Resolve any active alarms before continuing. See .
7.
Switch all UPS battery circuit breakers to the ON ( | ) position.
8.
If optional EBMs are installed, switch all EBM battery circuit breakers to the ON ( | ) position.
9.
Verify that the “Batteries Disconnected” alarm on each UPS has cleared. Verify that no other alarms
appear on any UPS front panel display.
If an
indicator is flashing on any UPS, do not proceed until all alarms are clear. Check the UPS status
from the front panel to view the active alarms. Correct the alarms and restart if necessary.
10. On any UPS, press any button on the front panel display to activate the menu options, and then press
the button until the TURN UPS ON/OFF menu displays.
11. Press the
button to display the TURN SYSTEM ON option; press the
button.
12. Confirm the selection. Press and hold the
button for three seconds, until the UPS stops beeping.
Verify that the
indicator illuminates solid on each UPS, indicating that the UPS is operating
normally and any loads not connected through the load connector are now energized.
If the
indicator on any UPS is flashing, do not proceed until all alarms are clear. Check the UPS
status from the front panel to view the active alarms. Correct the alarms and restart if necessary.
NOTE
For a parallel-ready system (a single UPS installed to be part of a future parallel system),
set the Parallel Operation Settings / Parallel Operation Mode to “Capacity Mode” to
prevent unnecessary alarms (see the “Operations” section ).
Each UPS should be in Normal mode. By default, Normal mode operates on the High Efficiency setting
(see section “Normal Mode” ).
13. To energize loads connected through the load connectors, switch all load connector circuit breakers to the
ON ( | ) position.
14. On any UPS, press the
ESC
button until the Start screen appears.
15. Verify that all UPSs in the parallel system are updated to the same firmware version.
NOTE
Firmware v2.0 does not operate in a parallel system with v1.xx. All UPSs must have
firmware v2.x installed.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...