Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
25
NOTE
There is a front and a rear stabilizing bracket to secure the system for shipping. The
brackets are bolted both to the pallet and the cabinet. The bolts must be removed
before unloading the system.
1.
Remove the four shipping bolts securing the front stabilizing bracket (see
).
2.
Remove the four shipping bolts securing the rear stabilizing bracket.
3.
Remove the brackets.
Figure 8. Removing the Stabilizing Brackets
Pallet Rear
Four
Shipping
Bolts
Bracket
4.
If the leveling feet are not fully retracted, turn the leveling feet clockwise until they are retracted (see
).
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...