13
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 5
Fig. 5.4.3 T275 – Splined pull arm assembly,
LH, 1 - 2 3/4" reveal
5.4 Arm assemblies
1
Drive arm
2.1
Adjustment shaft
tube, 225 mm
2.2
Adjustment shaft,
225 mm
3
Shoe
4
Axle extension
5.1
Adjustment shaft
tube, 450 mm
5.2
Adjustment shaft,
450 mm
1
Drive arm
2
CPD lever
3
Track
Fig. 5.4.4 T275 – Splined pull arm assembly,
RH, 1 - 2 3/4" reveal
Fig. 5.4.5 T – Splined pull arm assembly,
0 - 1" reveal
1
Drive arm
2
CPD lever
3
Track
1
4
2.1
2.2
3
Fig. 5.4.1 J8 – Splined push arm assembly,
225 mm, 0 - 8" reveal
Fig. 5.4.2 J12 – Splined push arm assembly,
500 mm, 8" - 12" reveal
1
2
3
1
2
3
1
3
1
5.1
5.2
3
4
5.5 Axle extension sleeves and extensions
Fig. 5.5.1 [20 mm]
08125201
Fig. 5.5.2 [30 mm]
08125202
Fig. 5.5.3 [60 mm]
08125203
1
20 mm axle
extension sleeve
1.1
20 mm axle
extension
2
M8 -1.25 x 40
SHCS
3
30 mm axle
extension sleeve
3.1
30 mm axle
extension
4
M8 -1.25 x 50
SHCS
5
60 mm axle
extension sleeve
5.1
60 mm axle
extension sleeve
6
M8 -1.25 x 80
SHCS
1
1.1
2
5
5.1
6
3
3.1
4