60
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 17
17 Arm with track mount installation
17.1 Arm with track installation
17.2 Splined arm and track assemblies
17.3 Splined arm and track hardware
1
Track
2
End cap
3
Fixing piece
3.1
M5 x 15 Phillips
FHS
4
Pull arm
5
20 mm axle
extension
5.1
Splined sleeve
6
CPD lever
6.1
M6 x 10 SHCS
7
Slotted spring pin
8
Pull arm cap
9
Slide shoe
10
Pivot pin
11
Retaining ring
12
Bumper
13
M8 x 1.25 x 40
SHCS
14
Wood screws
15
Machine screws
16
Bumper stop
17
M5 x 13 FHMS
cross recessed
Fig. 17.3.1 Track assembly
Fig. 17.2.1 T275/Splined arm with CPD
lever and track assembly, LH
1
Drive arm
2
CPD
3
Track
Fig. 17.2.2 T275/Splined arm with CPD
lever and track assembly, RH
Fig. 17.2.3 T/Splined arm and track assembly
1
Drive arm
2
CPD
3
Track
NOTICE
Reference Chapter 13 for pull arm and pull arm
as push installation templates.
1
2
3
1
2
3
1
3
1
2
3
3.1
4
2
3
3.1
5
5.1
6
7
8
9
10
11
12
13
14
16
17
6.1