8
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 4
4 ED900 Product overview
4.1 ED900 push arm system
Fig. 4.1.1 ED900 RH push arm system example
4.2 ED900 pull arm system
Fig. 4.2.1 ED900 RH pull arm system example
1
ED900 operator
2
T/track/arm
assembly
3
Axle extension
4
Standard cover
5
End cap, program
switch
6
End cap, power
switch
7
Mounting plate
7.1
115 Vac terminal
block
8
Spindle cap
9
Spindle cap
1
2
3
4
5
6
7
7.1
8
8
9
1
ED900 operator
2
J/pull arm
assembly
3
Axle extension
4
Standard cover
5
End cap, program
switch
6
End cap, power
switch
7
Mounting plate
7.1
115 Vac terminal
block
8
Spindle cap
9
Spindle cap
1
2
3
4
8
9
8
6
5
7
7.1