94
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 32
32.4 Pull arm maintenance
Fig. 32.4.1 Arm and track assembly
1
Track
2
Slide shoe
3
Pivot pin
6
Arm
Fig. 32.4.3 Track, slide shoe, pivot pin
7
7
7
End cap
2
3
6
1
32.4.1 Track mounting screws.
1. Set program switch to CLOSE.
2. Remove track end caps
3. Check tightness of track mounting
screws.
4. Replace end caps.
32.4.2 Track maintenance.
1. Set program switch to OPEN.
2. Track.
• Check for wear or damage.
3. Slide shoe and pivot pin.
• Check for wear or damage.
4. Bumper stop M6 screw.
• Check bumper stop position (bumper
location approximately 1/8" from slide
shoe)
• Check tightness of screw.
32.4.3 CPD lever.
1. Check tightness of M6 SHCS.
Fig. 32.4.5 Program switch
1
Track
2
Bumper stop
2.1
M6 FHMS
3
Bumper
4
Slide shoe, pivot pin
1
2
2.1
3
4
Fig. 32.4.2 Arm and track assembly
Fig. 32.4.4 CPD lever M6 socket head screw
3
M6 socket head
cap screw
5
3
5
CPD lever