69
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 20
1
2
20.1 Braking circuit plug position
20 Braking circuit plug
Fig. 20.1.1 Braking circuit socket and plug; plug factory installed in pull arm location
1
Braking circuit plug
2
Braking circuit 3
pin socket
3
User interface
Fig. 20.1.2 Plug position, pull arm
Fig. 20.1.4 Plug position, push arm
1
Braking circuit plug
2
Braking circuit
3 pin socket
1
Braking circuit plug
2
Braking circuit
3 pin socket
Fig. 20.1.3 Power switch
4
Power switch
(shown ON)
3
1
2
1
2
4
20.1.1 Braking circuit plug.
Braking circuit plug positioning required for
both ED900 operators.
Operator braking circuit plug is positioned in
its 3 pin socket for a push or pull installation.
WARNING
Braking circuit will not work correctly
if braking circuit plug is improperly
positioned, or if an incorrect plug is
used!
Door may close at high speed
and/or be difficult to open!
17.1.2 Factory-installed plug position.
Braking circuit plug is factory installed in the
left two pins, the pull installation position
(Fig. 20.1.1 and Fig. 20.1.2
).
17.1.3 Change braking circuit plug position
to push installation.
To change plug position for push installation,
install plug in right two pins, toward user
interface (Fig. 20.1.4).
WARNING
Insure power switch is OFF before
changing plug position!
Fig. 20.1.5 Standard push arm
Fig. 20.1.6 Arm and CPD lever and track,
pull or push installation