X2
e3
0b
g8
16
.1
0
STATUS PSM
DEV
SVS ST
NET ST
LINK/ACT
LIN
S
X2
LCP
STATUS DAM
DEV
SVS ST
NET ST
AUX
LINK/ACT
X1
X1
X
X2
X3
X3
LCP
Illustration 118: Removing the Module
10.5.2 Fitting and Commissioning the System Components
1. Check if preparation is required (see
).
2. Fit the system modules (see
4.7.3 Fitting Instructions for System Modules
3. Connect the electrical cables (see chapter Electrical Installation).
4. Switch the system on (see
6.9 Switching on the MSD 510 System
5. Configure the system module's parameters according to the fieldbus used (see
6. Conduct a test run.
10.6 Cable Replacement
10.6.1 Overview
Replace the cables when the rated number of bending cycles has been reached or the cable is damaged.
Maintenance, Decommissioning, and
Disposal
Operating Guide | VLT® Multiaxis Servo Drive MSD 510 System
AQ262450196490en-000101 / 175R1170
196 | Danfoss A/S © 2019.10
Summary of Contents for VLT MSD 510
Page 1: ...Operating Guide VLT Multiaxis Servo Drive MSD 510 System...
Page 2: ......