6. Replacing Parts
Replacement & Assembling
1.
Replace the Solenoid (7) from the Solenoid Base Bracket (6), with tightening torque 0.8 N·m.
Mount the Plunger Head (8) to the Plunger of the Solenoid (7) by pressing into the Pin Spring Roll AW3.
The direction of the Pin Spring Roll AW3 (9) is shown in the figure below.
Insert the Spring Compression 14x30 (10) between the Plunger Head (8) and the Solenoids (7).
The position of the Solenoids is shown in the table below:
From your side
Front row
Back row
Left edge
SB2843001GT3 Solenoid K Assy
SB2847001GT3 Solenoid W1 Assy
SB2845001GT3 Solenoid M Assy
SB2848001GT3 Solenoid W2 Assy
SB2844001GT3 Solenoid C Assy
SB2849001GT3 Solenoid W3 Assy
Right edge
SB2846001GT3 Solenoid Y Assy
SB2850001GT3 Solenoid W4 Assy
Do not protrude from both sides
Position of
clearance
Direction of Clearance in assembling
Tightening torque 0.8 N·m
0A5300806
SB2848001
SB2847001
SB2850001
SB2849001
SA5990001
4X
SA5990001
4X
SA5988101
4X
SA5988101
4X
SB2846001
SB2844001
SB2843001
SB2845001
SA5989101
4X
SA5989101
4X
0A5300806
SA6155001
SA6155001
047301242
4X
047301242
4X
(6)
(8)
(9)
(10)
(7)
(6)
(8)
(9)
(10)
(7)
Tightening torque 0.8 N·m
0024N
2.
Mount the Solenoid Base Bracket (6) to the Frame with the screws (5), with tightening torque 1.5 N·m.
3.
Connect the Harness: MNT Solenoid by checking the Tube Marks.
4.
Fix the Harness: MNT Solenoid with the Clips CS-6U and the Cord Clamp 13-L.
5.
Connect the eight Capping Tubes. (Refer to the Replacement & Assembling in “6-1-35. Waste Ink
Tubes”.)
6.
Mount the Maintenance Unit. (Refer to “6-1-16. Assembling / Disassembling of the Maintenance Unit”.)
GT-3 Series
212