Installing ground lug on Brocade VDX 6940-144S
4. Observe the following requirements and precautions when grounding this device:
•
NOTE
To ensure adequate bonding when attaching the ground lug, a minimum of 20 in-lb (2.76 Nm) of
torque is required to be applied to the mounting hardware used to attach the ground lug.
•
CAUTION
For the NEBS-compliant installation of a Brocade device with AC or DC systems, use a
ground wire of at least 6 AWG. The ground wire should have an agency-approved crimped
connector (provided with the device) attached to one end, with the other end attached to
building ground. The connector must be crimped with the proper tool, allowing it to be
connected to both ground screws on the enclosure. Before crimping the ground wire into
the provided ground lug, ensure that the bare copper wire has been cleaned and
antioxidant is applied to the bare wire. In addition, anti-rotation devices or lock washers
must be used with all screw connections for the grounding wire.
Observing power supply function
The following should occur after you apply power to the power supplies:
NOTE
Power is supplied to the device as soon as the first power supply is connected and powered on.
• The power supplies power up as soon as they are plugged in.
• The power supply LEDs display green.
• The power LED on the port-side of the device displays green.
• The system status LED on the port-side of the device displays amber until POST completes, and
then displays green.
After POST is complete, verify that the device power and status LEDs on the port side of the device
remain green.
Rack installation
You can install this device in the following racks:
• Four-post EIA rack
• Two-post Telco rack
Follow installation instructions shipped with the following rack-mount kits:
• Universal Four-Post Rack Kit (XBR-R000296) - Use this kit to install devices in EIA racks that are
between L-13.7 to 81.28 cm deep (L-5.0 to 32.0 in.), where L is the chassis depth. For installation
procedures, refer to the
Universal Four-Post Rack Kit Installation Procedures
.
• Universal Two-Post Rack Kit (XBR-R000294) - Use this kit to install 1U and 2U devices in a two-
post telecommunications (Telco) rack. For installation procedures, refer to the
Universal Two-Post
Rack Kit Installation Procedures
.
Observing power supply function
38
Brocade VDX 6940 Hardware Installation Guide
53-1003495-02
Summary of Contents for VDX 6940 Series
Page 1: ...53 1003495 02 25 June 2015 Brocade VDX 6940 Hardware Installation Guide ...
Page 6: ...6 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 14: ...What s new in this document 14 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 64: ...Verifying operation 64 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 84: ...Thermal operations 84 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 106: ...Replacing a transceiver 106 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 120: ...Germany 120 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...
Page 136: ...136 Brocade VDX 6940 Hardware Installation Guide 53 1003495 02 ...