5. Remove individual wires by unscrewing their terminals with the
screwdriver. For easy re-assembly, fully open the terminal barrels,
using six full turns.
6. Note the location of the tie wrap on the old cable and then cut away
the tie wrap without cutting the grommet.
7. Remove the grommet from cable and save for reuse.
D.4 New Cable Preparation
NOTE
This procedure assumes that you are using EIA/TIA T568B type patch
cord. See Table D-1 for other possible configurations. (If changing cable
types it may be necessary to contact Technical Support for calibration
assistance.) Read all instructions before starting cable preparation.
Figure D-2. Cable Preparation per EIA/TIA T568B.
1. Slide the plastic case and then the grommet onto the new cable.
2. Slit the jacket lengthwise 1
3
⁄
8
inches (35 mm). With ScTP, cut the foil
shield back to the jacket, leaving the drain wire intact. Pull the jacket
away and then cut it off close to the bundle.
78 INCHES (2 METERS) MAXIMUM
1.12
(28 mm)
(4 PLCS)
1. WIRE IN ACCORDANCE WITH EIA/TIA T568A.
2. VIEW SHOWS WIRE PAIRS UNTWISTED FOR PREP LENGTH.
NOTE: CUT SHIELD FLUSH
WITH CABLE JACKET.
1.38
(35 mm)
(4 PLCS)
0.25 (6 mm)
TINNED WIRE
ENDS (8 PLCS)
1.0
(25 mm)
NOTE: TIN END OF
DRAIN WIRE (ScTP ONLY)
0.25 (6 mm)
DRAIN WIRE
GREEN
WHITE-GREEN
ORANGE
WHITE-ORANGE
BLUE
WHITE-BLUE
BROWN
WHITE-BROWN
T568B.