B00418AA
4-14
Processing Samples
4.5 Add Racks to the Priority Rack Set Unit
1
Verify the orange LED on the priority rack set unit is not flashing.
This indicates racks are in progress. Wait until the LED stops flashing.
Figure 4.7
2
Open the cover of the priority rack set unit.
3
Place prepared rack(s) in positions 1 and/or 2. If racks are placed in
positions 1 and 2, the rack in position 1 is processed first.
4
Close the cover.
5
Select
Start
to begin processing the rack.
1.
Orange LED
B00418AA_AU5800 QRG_EN.book Page 14 Monday, December 13, 2010 9:59 AM