
Model T940 User Manual
Publication No. 980938 Rev. K
Programmable Channel Calibration 6-24
Astronics Test Systems
DRM Calibration Warmup
Equipment: Basic Setup
Procedure:
1. Allow the T940 DRM to warm to its nominal application temperature.
2. Hit the Continue button when the required temperature is reached. If
the temperature reaches 80°C, the process continues automatically.
Run Calibration
Equipment: Basic Setup
Procedure:
1. Press the Run button. Use the Stop button at any time to abort
execution.
2. Review the results in the Status window.
3. (Optional) Verify the results using the Verify button. Insure that all
channels pass verification.
4. (Optional) Check the individual gain and offset values for Src and
Snk in the field controls. These values are not in engineering units.
5. (Optional) Save the calibration to a file for later restore, e.g., File |
Load DRA Calibration.
6. (Optional) Update the module to the new calibration factors just
obtained using the Update button. If this step is omitted, the
calibration factors will revert at the next power cycle.