![Applied Biosystems 2720 User Manual Download Page 87](http://html.mh-extra.com/html/applied-biosystems/2720/2720_user-manual_2955102087.webp)
79
Thermal Cycler Temperature Verification System For GeneAmp
®
PCR Systems 2720, 9600, 9700, 9800,
and Veriti
®
System User Guide
Chapter 7
Calibration verification test
Configuring the
GeneAmp
®
9700
“Setting up the 0.5-mL probe assembly” on
.
2. Power on the thermal cycler. The Main menu opens.
For best results, allow the thermal cycler 15 to 30 minutes to warm up to
ambient temperature before performing the test.
3. Press
F4
(Util).
The Utilities screen opens.
4. Press
F1
(Diag). The Diagnostics screen opens.
5. Press
F3
(TmpVer). The Temperature Verification screen opens.
6. Press
F1
(Temp) to automatically configure the GeneAmp
®
9700 for the
calibration verification test. The Calibration Verification screen opens.
Temperature Verification
Temp - Calibration Verification
TNU - Temperature Non-Uniformity
F1
F3
F4
F5
F2
Temp
Exit
TNU
Calibration Verification
Block temp = xx.x°C Cover temp = xxx°C
Place probe in well A6
Press Run
F1
F3
F4
F5
F2
Run
Cancel